Laserfiche WebLink
A J OA U I Environmental Health Department <br /> COUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> RIVER POINT LANDING MARINA-RESORT* 4950 BUCKLEY COVE WAY, STOCKTON January 10, 2020 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 315 HSC 25291(e)Water in secondary containment not removed, analyzed, and properly disposed of(pre-Jul 2003). <br /> OBSERVATION: Liquid was observed in the diesel STP sump. <br /> REGULATION GUIDANCE: If water could enter into the secondary containment by precipitation or infiltration, it <br /> must be removed and disposed of properly. <br /> CORRECTIVE ACTION: The service technician removed the liquid from the diesel STP sump. Ensure that all <br /> sumps and annular spaces are maintained free of liquid. <br /> This was corrected on site. <br /> This is a minor violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by February 09, 2020. <br /> Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate ($152). To schedule an <br /> appointment, please call (209) 468-3420. <br /> Documents provided during inspection: Return to compliance certification form, corrective action statement and <br /> a list of scheduled free CUPA classes. <br /> Note that the technician did not have a certification for the monitoring panel, so the sensor testing could not be <br /> conducted/accepted. This testing must be completed by January 31st, 2020 to avoid additional violations. <br /> Provide 48 hours written notification to the EHD when this testing is scheduled. All EHD staff time associated <br /> with the re inspection will be billed at the current hourly rate ($152). <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: <br /> Date: January 10, 2020 Inspector: Inspector Phone: <br /> Printed Name and Title: PAUL NSO, EHS Trainee (209)468-3432 <br /> Brad Stermer, Harbormaster <br /> FA0003811 PR0231028 SCO01 01/10/2020 <br /> EHD 23-01 Rev.9/20/2019 Page 5 of 5 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />