My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002428
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
0
>
2600 - Land Use Program
>
UP-89-13
>
SU0002428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:24:57 PM
Creation date
5/15/2020 4:12:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002428
PE
2626
FACILITY_NAME
UP-89-13
STREET_NUMBER
0
STREET_NAME
FRENCH CAMP/ I-5
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
FRENCH CAMP/ I-5
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF' CALIF. -BUS . AND TRANS . AGENCY GEORGE DEUKMEJIAN, Governor. <br /> DEPARTMENT OF TRANSPORTATION <br /> P.O. Box 2048 (1976 E . Charter Way) <br /> STOCKTON, CA 95201 <br /> (209) 948-7936 <br /> December 30 , 1988 <br /> 10-SJ-5-R20 . 9 <br /> San Joaquin County <br /> Nolte & Associates <br /> Pre-Application <br /> UP-89-13 <br /> Mr. Harry Islas <br /> can Joaquin County <br /> Planning Division <br /> 1810 East Hazelton <br /> Stockton, CA 95205 <br /> Dear Mr. Islas : <br /> Caltrans has reviewed the Nolte Pre-Application for a Highway <br /> Service complex located in the southeast quadrant of the Interstate <br /> 5/French Camp Road interchange . As a result of this review we wish <br /> to offer the following comments. <br /> This project, which proposes the development of a restaurant, <br /> convenience store, fuel stations fer automobiles , RV' s and trucks , <br /> RV pumpout station, truck scale, etc . , will impact the ramps and <br /> ramp intersections at the Interstate 5/French Camp Road interchange. <br /> In order to adequately assess the impacts a traffic analysis needs <br /> to be prepared. It should include the following: <br /> - An estimation of the projects total trip generation <br /> using recognized trip generation factors. <br /> - The analysis should include at a minimum the existing <br /> traffic , the project related traffic, the cumulative <br /> traffic , along with AM/PM peak hour turning movements . <br /> This analysis should include project related and <br /> cumulative impacts to mainline Interstate 5 . <br /> - An estimation of the directional distribution of the <br /> project trips . <br /> - An evaluation of the project' s traffic impacts on the <br /> Level of Service (LOS) of the key intersections in <br /> the area including the above Interstate 5 interchange <br /> ramps and ramp intersections . <br /> - A discussion which recommends mitigation measures <br /> for significant impacts and a reference to funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.