Laserfiche WebLink
OPp•U 1!!i, C <br /> ` COUNTY OF SAN JOAQUI N <br /> L Z EUGENE DELUCCHI <br /> y' < DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> Cq''• ��P (209)468-3000 MANUEL LOPEZ <br /> <<FOR DEPUTY DIRECTOR <br /> HENRY M. HIRATA . �F ' C,�PPAYNE <br /> DIRECTOR1R=4!OR <br /> November 15, 1991 <br /> �oti� AVO V 18 <br /> "Qbmfujvq�' 19 <br /> 819 <br /> M—E—M—O—R—A—N—D_U_M �� rC Jy <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Charles Kelley, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-92-13 for a 50 ' X 100 ' steel storage building, <br /> located on the E. side of North 99 Frontage Road, S. of Clark Dr. , <br /> SE. of Stockton. <br /> APPLICANT: George H. Blanke APN: 179-172-37 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> North 99 Frontage Road has an existing right-of-way width of 56 <br /> feet, and planned right-of-way width of 56 feet. <br /> RECOMMENDATIONS: <br /> 1. The frontage improvement for North 99 Frontage Road shall be <br /> constructed in conformance with the standards for one-half of <br /> a 60-foot right-of-way rural street. The construction of the <br /> frontage improvements will be deferred upon execution by the <br /> owner of a Deferred Frontage and Roadway Improvement Agreement <br /> or a Secured Deferred Frontage and Roadway Improvement <br /> Agreement with a deposit equivalent to their estimated <br /> construction costs prior to approval of the Improvement Plan. <br /> (A $250 . 00 fee currently is required for processing per <br /> Planning Title Section 9-10502 in addition to a copy of the <br /> Grant Deed and an estimate for the required frontage <br /> improvements. The estimate and legal description shall be <br /> prepared by a Registered Civil Engineer with a typical section <br /> drawing on a form to be supplied by the Public Works Department <br /> and submitted to the Public Works Department for approval. As <br /> an option the Department of Public Works will prepare the <br /> drawing and estimate for an additional fee of $100. 00. ) <br /> (Planning Title Section 9-2143) <br />