My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2900 - Site Mitigation Program
>
PR0503361
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:18:48 PM
Creation date
5/15/2020 4:45:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0503361
PE
2960
FACILITY_ID
FA0005798
FACILITY_NAME
SOUTHWEST HIDE COMPANY
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
Zip
95366
APN
22809005
CURRENT_STATUS
01
SITE_LOCATION
11651 PALM LN
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TERRA GENESIS <br /> A California Corporation <br /> 1014 Sixteenth Street • Post Office Box 3047 • Modesto, California 95353 \ <br /> Telephone (209) 521-6260 • Telecopier (209) 521-5971 \� <br /> EPA Identification Number - CAD982040198 <br /> 0 ��. <br /> June 22, 1988 <br /> FERC <br /> Henry Hirata, Director <br /> Department of Public Works <br /> 1810 E. Hazelton <br /> Stockton, CA 95201 <br /> Subject: TERRA GENESIS, INC. SUBMITTAL OF COVER DETAILS FOR TREATMENT <br /> SLAB COVER DURING WINTER OPERATION (NOVEMBER 15th TO APRIL 1st). <br /> Greetings: <br /> During the past three months, Terra Genesis, Inc. staff and engineers <br /> have experienced on-going frustration in attempting to work with your <br /> staff. On March 10, 1988, Terra Genesis, Inc. received a conditional <br /> use permit to treat hydrocarbon petroleum-laden soil at a site in San <br /> Joaquin County. One of the conditions of the Use Permit required a drainage <br /> plan acceptable to the San Joaquin Public Works Department. After three <br /> and a half months, four formal meetings, numerous site designs and revisions <br /> and comments by your staff, I was informed that the San Joaquin Public <br /> Works Department cannot decide upon a recommendation. Furthermore, the <br /> Department is awaiting a decision from the San Joaquin Local Health District <br /> and will then most likely concur with that District' s decision. <br /> To my knowledge, the Health District retains no engineer capable of making <br /> an engineering design evaluation, which is why I suspect that the Public <br /> Works is being involved with this review. <br /> I went to San Joaquin Local Health District to determine the status of <br /> that agency' s review, and was told the following: <br /> 1. The Terra Genesis drainage plan had not been assigned to anyone <br /> as yet. <br /> 2. It was the Hazardous Waste Section' s position that it may not <br /> be assigned or considered by the Local Health District because <br /> the drainage issue was raised by Public Works and was thereby <br /> that agency' s responsibility. <br /> Terra Genesis, Inc. needs action on this problem as it is costing both <br /> our firm and the people of San Joaquin County large sums of money for <br /> each month this Use Permit is held in abeyance for no valid reason. I <br /> Providing services in transportation, disposal and treahnent of Hazardous znaste nnderials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.