My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PALM
>
11651
>
2900 - Site Mitigation Program
>
PR0503361
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:18:48 PM
Creation date
5/15/2020 4:45:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0503361
PE
2960
FACILITY_ID
FA0005798
FACILITY_NAME
SOUTHWEST HIDE COMPANY
STREET_NUMBER
11651
STREET_NAME
PALM
STREET_TYPE
LN
City
RIPON
Zip
95366
APN
22809005
CURRENT_STATUS
01
SITE_LOCATION
11651 PALM LN
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . The concrete slab's curbing will be sealed to prevent <br /> spillage of soil or water . <br /> 2 . *Soil Samples will be taken for laboratory analysis. <br /> (Petroleum Hydrocarbon content . ) <br /> 3 . Soil will be fertilized to bring Nitrate and phosphorus level <br /> to at least 20 ppm and 5 ppm. Soil will be thoroughly mixed . <br /> 4 . Soil will be thoroughly wetted to bring the field moisture <br /> level in the soil to 30 - 70 percent . <br /> *Ail laboratory analysis will be made by California certified <br /> laboratories. <br /> 5 . Prepare bacieriai additive, after incubation period, dilute <br /> and spray over the ontire surface of the contaminated soil . <br /> 6. Thoroughly mix the entire contaminated soil mass. <br /> 7 . Sprinkle the soil surface with water to maintain 30 - <br /> 70 percent moisture condition at all times. <br /> 8 . Repeat items 6 and 7 above on a daily basis to ensure that <br /> adequate oxygen and moisture reaches the entire mass. <br /> 9 . Take samples of soil every two weeKs for laboratory analysis <br /> to determine treatment progress. <br /> Note ; Depending on the temperature, concentration of contaminant and <br /> type of soil , it is estimated that most treatment cycles will range <br /> from 2-3 weeks in summer to 10-14 weeks in winter . <br /> 10 . When laboratory analysis indicates that the soil ' s petroleum <br /> hydrocarbon level has been reduced to meet regulatory agency <br /> acceptabvie standards, the cleansed soil is hauled away to its <br /> permanent resting place, the concrete slab will be reloaded as <br /> indicated above and treated as stated in items 1-10 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.