My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23665
>
2900 - Site Mitigation Program
>
PR0526080
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 8:53:14 AM
Creation date
5/18/2020 8:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526080
PE
2965
FACILITY_ID
FA0017647
FACILITY_NAME
RIVERBANK WASTEWATER TREATMENT PLNT
STREET_NUMBER
23865
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
CURRENT_STATUS
01
SITE_LOCATION
23865 S SANTA FE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> Riverbank Wastewater Treatment Facility <br /> Monitoring Well Installation Work Plan <br /> 1 GENERAL INFORMATION.................................................................................................................... 1 <br /> 1.1 INTRODUCTION AND BACKROUND.......................................................................... 1 <br /> 1.2 LOCAL GEOLOGIC AND HYDROGEOLOGIC CONDITIONS.................................... 2 <br /> 1.3 PROJECT PURPOSE...................................................................................................3 <br /> 2 DRILLING DETAILS............................................................................................................................7 <br /> 2.1 ON-SITE SUPERVISION OF DRILLING AND WELL INSTALLATION ACTIVITIES... 7 <br /> 2.2 DRILLING EQUIPMENT AND TECHNIQUES..............................................................7 <br /> 2.3 EQUIPMENT DECONTAMINATION PROCEDURES.................................................. 7 <br /> 2.4 SOIL SAMPLING INTERVALS AND LOGGING METHODS....................................... 8 <br /> 3 MONITORING WELL DESIGN..............................................................................................................9 <br /> 4 WELL DEVELOPMENT......................................................................................................................11 <br /> 5 WELL SURVEY................................................................................................................................ 12 <br /> 6 WORK SCHEDULE...........................................................................................................................13 <br /> 7 GROUNDWATER SAMPLING AND ANALYSIS.....................................................................................14 <br /> FIGURES <br /> Figure 1-1: Facility Location Map.....................................................................................................1 <br /> Figure1-2: Facility Site Map............................................................................................................2 <br /> Figure 1-3: Piper Diagram of Recent Groundwater Data................................................................4 <br /> Figure1-4: 52H vs. Chloride............................................................................................................6 <br /> Figure 3-1: Replacement Well Design and Existing Well Destruction...........................................10 <br /> TABLES <br /> Table 1-1: Historical Monitoring Well Total Coliform(MPN/100ml) ................................................4 <br /> APPENDICES <br /> Appendix A—LOG OF BORING,MW-5 <br /> July 2015 Conformed Wth 21 October 2015 Conditional Approval i MW5 Replacement <br /> Cilyof Riverbank WMF Monl*g Well Installation Workplan <br />
The URL can be used to link to this page
Your browser does not support the video tag.