Laserfiche WebLink
KLEINFELDER <br /> TABLE 10 <br /> QUALITY CONTROL SAMPLES <br /> Sample Type of QC Sample Number of Rationale for No. of Analytical Parameter <br /> Matrix Samples QC Samples <br /> "At least one <br /> Matrix Spike/Matrix per batch Cu, Ni, Cn, Al, Cr+6, <br /> Soil Spike Duplicate 1 (approximately 20) Cr III and/or, pH <br /> soil samples as per as applicable <br /> the EPAprotocol" <br /> "One per batch of Cu, Ni, Cn, Al, Cr+6, <br /> Soil Duplicate 2 soil samples" Cr III and, pH <br /> Abbreviations <br /> TP-1 Treatment Plant Discrete Sample TP-1 pH Corrosivity <br /> Cr'e Hexavalent Chrome All Aluminum <br /> Cr III Chromium III Cu Copper <br /> Cn Total Cyanide Ni Nickel <br /> 6.8. SITE SAFETY PLAN <br /> A health and safety plan is intended to prescribe basic procedural and minimum <br /> equipment requirements for worker protection of personnel and subcontractors. For this <br /> project, CAL/OSHA will have regulatory jurisdiction over Kleinfelder personnel and <br /> Kleinfelder's subcontractors. The site safety plan in conjunction with Kleinfelder's Code <br /> of Safe Work Practices and Health and Safety Policy Manual meets the requirements <br /> described by 8 CCR 5192 and 29 CFR 1910.12. A copy of the SSP is included in <br /> Appendix F. <br /> 57252.T02/ST05R999/DH:ly Page 23 of 29 <br /> ©2006 Kleinfelder, Inc. September 1,2005 <br />