My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1137
>
2900 - Site Mitigation Program
>
PR0530031
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 9:23:11 AM
Creation date
5/18/2020 9:10:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0530031
PE
2960
FACILITY_ID
FA0019740
FACILITY_NAME
IDEALEASE (FORMER)
STREET_NUMBER
1137
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1137 S STOCKTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Assessment Work Plan <br /> IDEALEASE - STOCKTON <br /> 1137 South Stockton Street, Stockton, California <br /> SECTION PAGE <br /> 1.0. INTRODUCTION................................................................................................... 1 <br /> 2.0. SCOPE OF WORK................................................................................................1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK PREPARATIONS................................ 2 <br /> 2.2. SOIL PROBE BORING AND SAMPLING .......................................................... 2 <br /> 2.3. LABORATORY ANALYSIS ................................................................................ 3 <br /> 3.0. PROCEDURES.....................................................................................................3 <br /> 3.1. SOIL PROBE BORING ADVANCEMENT.......................................................... 3 <br /> 3.1.1. Soil Sampling...............................................................................................4 <br /> 3.1.2. Boring Abandonment...................................................................................4 <br /> 3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT..........................4 <br /> 3.3. REPORTING......................................................................................................4 <br /> FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 —Adsorbed TPH-d: Post-Excavation <br /> APPENDICES <br /> Appendix A - Central Valley Regional Water Quality Control Board Directive Letter <br /> Appendix B - Site Background Information <br /> Advanced GeoEnvironmental Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.