My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
935
>
2900 - Site Mitigation Program
>
PR0536352
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 9:38:27 AM
Creation date
5/18/2020 9:36:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536352
PE
2950
FACILITY_ID
FA0020883
FACILITY_NAME
III INTERNATIONAL INC
STREET_NUMBER
935
Direction
E
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
15128031
CURRENT_STATUS
01
SITE_LOCATION
935 E SCOTTS AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 6 <br /> From: Andrew Lush [mai Ito:lushgeo@msn.com] <br /> Sent: Thursday, June 02, 2011 11:03 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Drilling <br /> I apprecite your help. You should have received an email from Tim Tyler at ECA wit the form/letter <br /> allowing me to sign on their behalf- i think you got his before my materials and replied to him <br /> asking what it was all about. I see that in the email string below. <br /> I will take reponsibility for any other SITE fees, acting as the Site billing party. <br /> As for timing, I realize that I am at the mercy of schedules and your inspectors' willingness and <br /> ability to commiserate. Anything I can do to sped the process will be done. <br /> Subject: RE: Drilling <br /> Date: Thu, 2]un 201109:20:57 -0700 <br /> From: MInfurna@sjcehd.com <br /> To: lushgeo@msn.com <br /> Andy, <br /> I stopped what I was doing to check your submittals for completeness so I can <br /> forward it to the boss for assignment. <br /> First off, I'll need and Authorization to Sign for YOU to sign for ECA (drillers). <br /> page 2 of our permit pac has this at the bottom. EHD issues permits to drillers/C- <br /> 57s, not consultants. When a consultant signs the permit application, the driller <br /> must authorize that person to sign on their behalf. Either have ECA fill in your <br /> name and sign our page 2 and get it to me OR, have the driller/ECA send me a <br /> letter with his signature on it saying it's OK for you to sign for ECA. ONE OR <br /> THE OTHER must be sent in. <br /> Second, each permit must have a Master File Record (MFR) . AND new sites like <br /> this ALSO need a MFR for the billing NOT associated with the drill. One of the <br /> $366 fees you paid was for a pre-payment on a new site and the required MFR <br /> identifies WHO will pay NON-permit fees. Since you sent the required <br /> permit MFR that listed Lush Geosciences Inc as the billing party for the drilling <br /> fees, if you also plan on taking the site billing responsibilities I can duplicate this <br /> MFR and you won't need to send another MFR. <br /> so, please one of the following: <br /> 1- advise me in an email that Lush will take SITE billing party also OR <br /> 2- have someone else complete, sign, and submit the attached blank MFR to act as <br /> the site MFR. <br /> I cannot complete the processing and forward your packet to the boss w/o all the <br /> info here. <br /> the quicker you address this, the quicker I can finish the processing and get it to the <br /> boss who can assign it to an inspector. Whether or not that inspector can make <br /> YOUR schedule is unknown now. <br /> you should know, the EHD advises that you should allow 10 working days for <br /> 6/6/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.