~
<br /> CONSTRUCTION STAKING _LIA_8I_L_1_T_Y_W_A1VER-
<br /> These improvement plan�i have been prepared with t he
<br /> intent that the firm Of Haumbach & Piazza, Inc . wi I I be
<br /> performing the coniitruction Istakiriq for the complete Z",
<br /> project. If . however, another encjineering and/or
<br /> surveyino -firm should be employed to use these plans for
<br /> the purpose of construction staking , notice i-- hereby
<br /> given that the firm of Baumbach & Piazza, Inc . will not
<br /> assume any responsibility Jor error!-:. or omissions, if 77�
<br /> any, which might occur and which could have been 6 9,
<br /> avoidie d' 42 S JP d J 9 UTILITY SERVICES TO BE PROVIDED BY :
<br /> corrected or mitigated if Baumbach & Piazza, Inc . had '44
<br /> performed the _-�taking work . i/ Z4 I - Water Mokelumne Acres Maintenance Distric t
<br /> sampel-:�; 0�,Dkal) 2. Sanitary- Woodbridge Sanitary Di strict
<br /> 4. Telephone
<br /> 5. El ectri c Pacific Gas and El eCtric Company
<br /> 6. Natural Gas- Pacific Gas and Electric Company
<br /> 4b 4
<br /> 210
<br /> `0 1 . A grading
<br /> the cQJ
<br /> County Building Insi.)ect an Divi5ion .
<br /> XX t g h
<br /> t 12
<br /> N be taken 'for the building pad and the pavement
<br /> t'e 'J'dJ
<br /> btlo r f e m 'i
<br /> EX15t1179 PO VeMPn t a I s I P/r-Jp/Jc JVd
<br /> r1a LJ
<br /> subgrade and the
<br /> resul t5
<br /> / "I shall be submitted to the engineer . T he
<br /> 7 cQ`5ts Of re-tests shall be borne by the contractor .
<br /> Engineer
<br /> final grading and
<br /> \711 A/ - gy approVeL compaction prior- to paving .
<br /> 4 . All work shall Conform to these plans
<br /> and any special C) �J
<br /> Zoo o.5 44,0 Project , unless other"i5e noted .
<br /> U ergroLn u I I IeL- were plotted from 6vai I able records .
<br /> The Contractor shall be responsible for contacting al I utility ager)cles
<br /> -k facilities in the field before any excavation .
<br /> J.
<br /> Z� Con t raL tor sh"I I noti f y -ordinateall work with any agency requ ring
<br /> and co
<br /> remova
<br /> 1 , conbtruction or relocation of their utilities .
<br /> 9,0 Pacific Bell ,
<br /> P. G. & E . , Lodi Cable T . V. , City of Lodi Electrical , Water , Se�,qer 6nj
<br /> backf il 1 th" l 1 be native material or approved import at 90% R. C . N C)
<br /> ef
<br /> jetting will be allowLd .
<br /> 7 . Water ut-ed in any phast? of conr�truction , such as backfill C0rYiPcACt1c-jn , du�,t
<br /> control testing
<br /> Ae i or other work herein required 5hal I be included IFI thk-,
<br /> ufflip sum
<br /> 11 0.1 17 1 for the job site conditions during the cour5c, of can,5truction of thiIt,
<br /> project , including safety for all Persons and property , that this
<br /> requirement thall apply continuously and not be limited to nor,riAl working
<br /> and hold trie 0"n&r
<br /> 7 Ct `-4 land the Engineer harmleb!�, from any and all liability , real or alleqLd , in
<br /> Plon5 fc>r a`e tails IZ4 with the Performance of work on this project, excepting tr
<br /> LEGEND Q` connec tion
<br /> liability arising from the sole negligence of
<br /> 9. Electrical lines, irrigation lines and landscaping are not a part of thL--�,L'
<br /> 10 Domestic and irrigation water lines Contractor and Electrical Contractor
<br /> to coordinate work
<br /> with Grading and Underground Contractor . Cumpu(.,, ti(,)ri (�) i
<br /> 71 underground utilities to be provided by installing Contractor .
<br /> utilities, including Gas, Cable T.V. , Electrical
<br /> %( Telephone lines shall be installed prior to replacement of
<br /> *h411 remove asphalt Concrete it
<br /> 4, Contractor . General Contractor
<br /> ri
<br /> 1:5 All existing ir ti t�oi i
<br /> pr removed' .
<br /> X�P 14 . Refer tD tow ArLhitectural drawings for detailed site plan and for
<br /> -77 777 4) Ii Ccrd;; -1� P/a detallsi not included in these plans ( - nLluding concrete Walk and ��IL�b)
<br /> cor7c, k1alk 15. Al I earthwork and other construction shown on thib plan -.ihal I
<br /> comply with the .-equirements of the Soi 15 Report for this prUj L-4(7
<br /> to be provided by the Developer .
<br /> on -Orm
<br /> T, ct 1' 16, A-2 C,�/
<br /> 59117
<br /> r1111 ILI'
<br /> EARIHWORK
<br /> Excavation 150 C . y .
<br /> ��\ \ :.j,�71�,
<br /> Import Required - 250 C .Y .
<br /> 1110 Ap 4;
<br /> Z%i7xo 00 Jls hi 4r,
<br /> Note: Z
<br /> -�6g-p 1 4
<br /> rt to be provided by the Developer . o 0: ip
<br /> w W7
<br /> RV 7Y ome
<br /> Mortar JoInt
<br /> 14
<br /> CQ
<br /> V_ Y-46I d%V/_4C,9�7,e
<br /> 7 DW 41
<br /> 71
<br /> AA Als.111 ie
<br /> J4 bleil 48
<br /> .6 IN - PLACE
<br /> CAST
<br /> CONCRETE CURB
<br /> ZA SWII CURB 8, GUTTER
<br /> 4.01 DETAIL
<br /> NO
<br /> DATE REVISIONS
<br /> NO. DESIGN DRAWN PR,5P9R,5D FOR
<br /> CIVIL ENGINEERS
<br /> I t-L
<br /> '
<br /> �
<br /> '
<br /> '
<br /> �
<br /> ,
<br /> --'
<br /> -
<br /> ^
<br /> `
<br /> _
<br /> �
<br /> -
<br />
|