Laserfiche WebLink
Item No. 1 <br /> PC: 10-21-93 <br /> VR-93-3 <br /> Page 2 <br /> PROJECT DESCRIPTION <br /> During an on-site inspection of the gazebo by Building Inspection staff, it was determined that the gazebo <br /> may be in the floodway, and a stop-work order was issued. <br /> The applicant is seeking to obtain a Flood Variance for a gazebo that has been constructed in the <br /> floodway of the Mokelumne River and which is a replacement for a previous gazebo. <br /> Further, it is noted that the gazebo is located on the water side of the flood protection levee of Flood <br /> Control Zone No. 10. <br />