ATC Associates Inc. <br /> YATC <br /> 1117 Lane Palm Avenue,Suite 201 <br /> Modesto,California 95351 f <br /> 209-579-2221 <br /> ASSOCIATES i N c. Fax:209-579-2225 <br /> vapor extraction system. A Solleco 250 ECAT electric/thermal catalytic oxidizer was installed on <br /> site. <br /> The remediation system consisted of four vapor wells (V W I through V W4) connected by <br /> subsurface piping to an electric catalytic/thermal oxidizer. The thermal oxidizer is a 250 ECAT <br /> manufactured by Solleco. The remediation system is optimized to run at a minimum of 600 <br /> degrees Fahrenheit(F)at a total flow rate of 235 cubic feet per minute(SCFM). <br /> A 15 by 20 foot privacy slat chain-link fence was installed by Hayes Fence Company,enclosing the <br /> remediation compound. Slats were installed in the fence to provide visual screening of the <br /> equipment installed on the property. <br /> Request to establish a secondary power source for the remediation system was submitted to Pacific <br /> Gas &Electric(PG&E) Company on July 13,2005. On August 18,2005, an engineer from PG&E <br /> visited the site to describe the most feasible and cost effective manner to establish a separate power <br /> source to the remediation compound. <br /> Remediation system startup was performed on September 6, 2005. At the time of startup, vapor <br /> samples were taken under supervision of a SJVACD regulator. At time of startup (September 6, <br /> 2005), analytical results for the influent sample detected TPHg vapors at a concentration of <br /> 21,000 parts per million by volume (PPMv). TPHg results for the effluent were measured at 11 <br /> PPMv. These values represent a 99.95% destruction efficiency for the SVE system at time of <br /> startup. The system operated approximately 10 hours a day, however due to noise complaints by <br /> on-site residents of the temporary generator, the SVE system was started and turned off daily by <br /> field technicians. <br /> ATC submitted the Remediation System Installation Report on September 21,2005 documenting <br /> the installation of the vapor extraction system. On November 1,2005,ATC submitted the Vapor <br /> Extraction System Startup report for the site. <br /> PG&E installed a new transformer on a near-by existing electric pole located on Steinegul Road <br /> and ran an over-head power to a customer built pole on the property. The generator was taken off- <br /> line on February 20,2006 when the direct feed electrical service was completed. <br /> SCOPE OF WORK <br /> Planning and Permits <br /> I <br /> EHD permits and associated fees for the advancement of six soil borings are attached. ATC will <br /> schedule field personnel and equipment, notify Underground Services Alert to locate <br /> underground utilities as required, and perform other necessary field preparation and job start-up <br /> activities. <br /> wA25291keportsbvkpCPT.doc 3 <br />