Laserfiche WebLink
k I. INTRODUCTION <br /> BACKGROUND AND UNDERSTANDING <br /> The County of San Joaquin Department of Public Works is seeking the <br /> assistance of a .waste management consultant with extensive experience in <br /> l <br /> (1) installing and sampling water and gas monitoring wells. (2) per- <br /> forming Calderon testing, and (3) evaluating methane recovery potential <br /> at the Harney Lane Sanitary Landfill . The Harney Lane Sanitary Landfill <br /> i <br /> 1/2 mile west of the <br /> is located south of Harney Lane, approximately <br /> intersection of� Narney Lane and Tully Road in San Joaquin County, Cali- <br /> fornia. Approximately 112 acres of the 127-acre site are being utilized <br /> for landfilling. In our previous submittal , EMCON Associates estab- <br /> lished its qualifications to assist the County in this effort and was <br /> ` selected to submit a proposal . <br /> The goals of work effort described in this proposal are to <br /> (1) locate and: install! the <br /> four ground-water monitoring wells and perform <br /> the first round of sampling and laboratory analysis of the installed <br /> wells and five nearby domestic water wells, (2) install 10 gas monitor- <br /> ing probes and conduct the first round of sampling and analysis for the <br /> presence of gas in the probes, (3) conduct Calderon air testing of the , <br /> k site and prepare an Air Solid Waste Assessment Report, and (4) analyze <br /> the potential for methane recovery and prepare a report of the findings. <br /> { I <br /> PROPOSAL ORGANIZATION <br /> a <br /> EMCON' s proposal is organized generally in accordance with the scope of <br /> services described in the County's RFP of October 15, 1986. <br /> The detailed Scope of Work presented in Section II is followed by a <br /> description of the management approach that will be used to perform the <br /> described work tasks. Key members of the EMCON team whose skill and <br /> experience are especially appropriate to the project are introduced in <br /> I <br /> Section IiI. Section IV presents a project schedule by task for the <br /> PRA 8601-37A <br /> 1 <br /> Mon Associates <br /> { <br />