Laserfiche WebLink
%VDRK REQUEST FORA <br /> Date of Request 031406 Requested Completion Date 081806 <br /> 1 <br /> Proj Name Greer Construction Proj No- 5a 25291 0001 <br />' Site ALddress 15634 Steinegui Rd Esc:alon Task 01 <br />' Pi olect Manager Jeanne I-lomse v Field Tech Alex F / Nathan C <br /> Philip L. <br />' <br /> Client Contact Brian Greer Phone No- 838-3596 <br />' Regulatory Contact .teff Wong Phone No 468-0335 <br />' Approval. Completion Date <br /> Notify Client contact and Regulator 48 hrs pnor_to field work <br />' On-site contact Albert Veldstra 838-7894 <br /> Monitor DTW,DTB in all nine gw monitonrig wells and on-site dnnking water <br /> well, if possible <br /> Purge and sample all wells MW-1-6 8&9 in order plus domestic well <br /> Monitoring order MW8, DW 9 4 3. 1 5. 2 & 6 <br />' Monitor for D O with YSI 95 in all groundwater monitoring wells <br /> Contain well purged water Take two drums <br /> Sample all wells for BTEX/ TPH2 by EPA 8021B/ 8015M and fuel oxygenates by <br />' EPA 8260B <br /> Samples to Argon Labs Note in C-O-C to report MTBE at lowest detection Limit <br />' possible and to submit e-data in Geotracker format Global ID # T0607700051 <br /> All wells are two-inch. dtw last 08105 —68-74' dtb —90-100' <br />' <br /> Prepare purchase order requisition form <br /> Note MW7 was converted to VE3 screen 40-50'. well is dry <br /> 1 <br /> #FLORES GREER doc <br />