My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010438
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEINEGUL
>
15634
>
3500 - Local Oversight Program
>
PR0540821
>
ARCHIVED REPORTS_XR0010438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 10:56:37 AM
Creation date
5/18/2020 10:15:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010438
RECORD_ID
PR0540821
PE
2960
FACILITY_ID
FA0023401
FACILITY_NAME
FORMER GREER CONSTRUCTION
STREET_NUMBER
15634
STREET_NAME
STEINEGUL
STREET_TYPE
RD
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
15634 STEINEGUL RD
P_LOCATION
06
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc <br /> Lone Palm Avenue, Surte B <br /> VModesto, Califorma 95351 <br /> 209-579-2221 <br /> ' A S S O C I A T E S 1 w C Fax 209-579-2225 <br /> ' Control District permit to operate Vapor sample laboratory analytical data are summarized in Table 3 <br /> and laboratory data sheets are included m Attachment 4 <br /> ' Soil Vapor Extraction System Evaluation <br /> From June 16, 2006 to September 27, 2006, the system was operational for 1,102 80 hours During <br /> ' the third quarter of 2006, the average extracted vapor flow rate was 202 67 cubic feet per minute <br /> (SCFM) and the average influent vacuum achieved by the catalytic oxidizer was approximately 4 3 <br /> inches of mercury <br /> ' TPHn <br /> Assuming an average influent flow rate of 202 67 SCFM and average influent TPHg concentration <br /> of 380 00 PPMv, the total mass of TPHg removed from the system between June 16 and <br /> September 27, 2006 is 1,119 49 pounds Since startup on September 6, 2005 TPHg recovery has <br /> been 14,570 71 pounds <br /> Benzene <br /> Using the average influent flow rate of 202 67 SCFM and average influent benzene concentration <br /> of 0 28 PPMv, the total mass of benzene removed from the system between June 16 and <br /> September 27, 2006 is 0 75 pounds Since startup on September 6, benzene recovery has been <br /> 24 36 pounds <br /> ' Toluene <br /> ' Using the average influent flow rate of 202 67 SCFM and average influent toluene concentration <br /> of 2 19 PPMv, the total mass of toluene removed from the system between June 16 and September <br /> 27, 2006 is 6 89 pounds Since startup on September 6, toluene recovery has been 15174 <br /> ' pounds <br /> Ethvlbenzene <br />' Using the average influent flow rate of 202 66 SCFM and average influent ethylbenzene <br /> concentration of 1 18 PPMv, the total mass of ethylbenzene removed from the system between <br /> June 16 and September 27, 2006 is 4 28 pounds Since startup on September 6, ethylbenzene <br />' recover has been 52 19 pounds <br /> Total Xylenes <br />' Using the average influent flow rate of 202 67 SCFM and average influent xylenes concentration <br /> of 13 53 PPMv, the total mass of xylenes removed from the system between June 16 and <br /> September 27, 2006 is 49 05 pounds Since startup on September 6, the total xylene recovery has <br /> been 378 80 pounds <br /> Calculations for contaminants extracted from soil are summarized in Table 4 <br /> S 154 29519001�0&M11st-qtr-2005 doc 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.