Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request. 111204 Requested Completion Date 111904 <br /> Proj Name Greer Construction Proa No 54 25291 0001 <br /> Site Address 15634 Steinegul Rd., Escalon Task 01 <br /> Project Manager- Drew Van Allen Field Tech _Alex F , <br /> Client Contact: Brian Greer Phone No 838-3596 <br /> Regulatory Contact: Jeff Wong Phone No 468-0335 <br /> Approval. 4_ AJLWV Completion Date- <br /> Notify Client contact and Regulator 48,hrs prior to field work _ <br /> On-site contact Albert Veldstra 838-7894 <br /> Monitor DTW/DTB in all nine gw monitoring wells and on-site drinking water <br /> well, if possible <br /> Purge and sample all wells MW-1-10 wells in order <br /> Monitoring order MW-10 8 DW 3 4 9 5 1 6 & 2. <br /> Monitor for D O. with YSI 95 in all groun water monitoring wells <br /> Contain well purged water. Take two drums. <br /> Sample all wells for BTEX/TPHg and fuel oxygenates by EPA 8260B <br /> Samples to Argon Labs. Note in C-O-C to report MTBE at lowest detection Limit <br /> possible and to submit a-data in Geotracker format. Global ID 4 70607700051 <br /> All wells are two-inch dtw last 02/04 —73-78' dtb —90-100' <br /> Note MW10 is damaged-inaccessible. <br /> Prepare p1jEchase order requisition form <br /> Note MW7 was converted to VE3 screen 40-50' well is da <br /> AFLORESIGREER doc <br />