Laserfiche WebLink
FIELD WORK REQUEST <br />' VAPOR EXTRACTION TEST <br /> Greer Construction <br />' 15634 Steinegul Road, Escalon, California <br /> rPROJECT INFORMATION <br />' Project No 54 25291 0001 Date Assigned 09/17/03 <br /> Project Manager Drew Van Allen Field Work Dates 09118103-09/19103 <br /> Field Technicians Alex Flores & Casey Kipf Completion Date 09/19/03 <br /> CONTACT LIST <br />' Project Manager Drew Van Allen Cell Phone 209 648-0647 <br /> Client Raymond Greer Phone <br />' On-Site Contact Albert Veldstra Phone 838-7894 <br /> San Joaquin County DEH Jeff Wong Phone 209 381-1082 <br /> 073003 <br /> WELL INFORMATION <br />' WeIl Id Ft from VE2 Ft from VE3 Well Dia Screen <br /> VEI 34 19 2" 30-40' <br /> VE2 0 40 2" 50-70' <br /> nePd� VE3 40 0 2" 30-50' <br /> MW6 35 35 2" 95-100' <br /> 1 MWI-5, 8-10 2" 70-90' <br /> EQUIPMENT <br /> • Collect all equipment as needed for test in Modesto office <br /> • Test all equipment including blower, meters, detectors, generator, etc <br /> Equipment List <br /> • 51HP Blower with condensate knockout <br /> • Generator <br /> • Vapor well connections 2" <br /> • Magnehelic gauges - set <br /> • OVM/ PID <br /> AFLORES/GREER/VETPILOT DOC <br />