Laserfiche WebLink
WORK REQUEST FORM <br /> J <br /> Date of Request 111903 Requested Completion Date 112003 <br /> Prod Name Greer Construction Proj No. 54 25291 0001 <br /> Site Address 15634 Stemeizul Rd , Escalon Task 01 <br /> Project Manager Drew Van Allen Field Tech Alex F /��J�► �- <br /> Client Contact Brian Greer Phone No- 838-3596 <br /> Regulatory Contact Jeff Wong Phone No- 468-0335 <br /> Approval Completion Date <br /> Notify Client contact and Regulator 48 hrs prior to field work <br /> On-site contact Albert Veldstra. 838-7894 T <br /> Monitor DTW/DTB in all ten gw_monitoring wells and on-site drinking water <br /> well, if possible <br /> Purge and_sample all wells MW-1-10 wells in order <br /> _Monitoring order MW-10, 8, DW, 3, 4, 9, 5,-1, 6 & 2 <br /> Monitor_ for D O with YSI 95 in all aroundwater,monitoring wells <br /> Contain well purged water Take two drums. <br /> Sample all wells for BTEX/TPHg, TPHd and fuel oxygenates by EPA 8260B <br /> Samples to Argon Labs Note in C-O-C to report MTBE at lowest detection Limit <br /> -possible and to submit e-data in Geotracker format. Global ID # T0607700051 <br /> All wells are two-inch, dtw last (06101) —69-75', dtb —90-1.0.0' <br /> Note MW 10 is damaged <br /> Prepare purchase order requisition form <br /> Survey well head elevation from MW8, tie into three existing monitoring.wells <br /> Note MW7 was converted to VE3 screen 40-50', well is dry <br /> AFL,ORE5IGREER doc <br />