Laserfiche WebLink
OZONE INJECTION , SOIL VAPOR EXTRACTION <br /> AND TREATMENT SYSTEM <br /> RANCH MARKET <br /> 23569 SOUTH :SANTA FE ROAD <br /> RIVERBANK, CALIFORNIA <br /> GENERAL NOTES: EQUIPMENT SUPPLIED BY OTHERS: <br /> I <br /> THE SCOPE OF WORK INCLUDES INSTALLATION OF CONVEYANCE PIPING IN QUANTITY DESCRIPTION <br /> APPROXIMATELY 525 FEET OF UNDERGROUND TRENCH AND MOUNTING <br /> PROCESS EQUIPMENT FOR THE PURPOSE OF OZONE INJECTION AND 1 TRAILER-MOUNTED CATALYTIC OXIDIZER <br /> �'✓ — `r� P KNOCK-OUT POT <br /> EXTRACTINGAND TREATING SOIL VAPOR. r �� �: ' WITH VACUUM PUMP, <br /> THE WORK UNDER THIS CONTRACT INCLUDES FURNISHING ALL LABOR, TF�ANSFER PUMP,AND CONTROL PANEL <br /> - �— "t _ <br /> MATERIALS,AND EQUIPMENT NOT SUPPLIED BY OTHERS TO CONSTRUCT THE _, _ K _ &ONE INJECTION BLOWER <br /> OZONE INJECTION AND SOIL VAPOR EXTRACTION SYSTEM, INCLUDING ` . -__.•_••.yrc;_ �_.:I <br /> CONSTRUCTION AND INSTALLATION OF EXTRACTION WELL VAULTS, —�' �`-- ' - ' rt we . � � I ` 1 1,000-GALLON POLY HOLDING TANK <br /> HEADWORKS, ELECTRICAL AND MECHANICAL EQUIPMENT, EARTHWORKS, � ` ..' 1` r r 4 �` •• r` <br /> AND OTHER RELATED WORKTO PROVIDE A COMPLETE OPERABLE SYSTEM. _ fycM- <br /> CERTAIN SPECIFIED ITEMS WILL BE SUPPLIED BY OWNER UNLESS OTHERWISE 23 <br /> NOTIFIED IN CONSTRUCTION DRAWINGS. THE CONTRACTOR SHALL c, ` ° i ' SITE <br /> COORDINATE DELIVERY OF THESE ITEMS WITH THE ENGINEER TO FACILITATE r/ i; t } . -� -- <br /> THE CONSTRUCTION SCHEDULE. THE CONTRACTOR IS RESPONSIBLE FORC1a1; `, s f- — <br /> INSTALLATION AND TESTING OF THE ITEMS. ,� nr j - f �ii`� r i � DRAWING INDEX <br /> PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL FIELD ,, " g ? K �� i _ 1, TITLE SHEE':I AND SITE LOCATION MAP <br /> DIMENSIONS AND EXACT LOCATION AND DEPTH OF EXISTING UTILITIES AND <br /> BURIED OBSTACLES, PROTECT IN PLACE, AND IF DAMAGED, CONTRACTOR ;^., c -y' r `'°� :' _.� ';,,�, ~.- 2. CONSTRUCTION NOTES <br /> SHALL REPAIR THEM AT NO ADDED EXPENSE TO OWNER.CONTRACTOR SHALL <br /> BE RESPONSIBLE FOR SUBSURFACE OBSTACLES ENCOUNTERED DURING A ,% L' 3. SITE PLAN WITH SVE/OS SYSTEM LAYOUT <br /> 4 <br /> EXCAVATIONS. <br /> 4. TREATMENT COMPOUND PLAN <br /> CONTRACTOR SHALL BE REQUIRED TO SAW CUT EXISTING CONCRETE AND <br /> ASPHALT IN A NEAT STRAIGHT LINE, AND REPLACE SURFACE WITH SIMILAR _ f -"" ':a` 6. PIPING:DETAILS <br /> MATERIAL UPON COMPLETION. REMOVAL AND RESTORATION OF PAVEMENT <br /> p SHALL NOT BE AN INTERRUPTION TO TRAFFIC IN THE THOROUGHFARE. ____ ' S. TREATMENT COMPOUND DETAILS <br /> o SPECIAL CONDITIONS, USE OF TRENCH PLATES,AND HOURS OF OPERATION <br /> fESSI <br /> TO BEADDRESSED DURINGJOBWALK SITE LOCATION MAP �qP B �9(� 7, ELECTRICAL DETAILS <br /> CONTRACTOR SHALL INSTALL ALL PIPING AND CONDUIT,ACCORDING TO ALL SCALE; 1" W 2,000 FEETCIO`���`� 8. PROCESS AND INSTRUMENTATION DIAGRAMS <br /> LOCAL, STATE, AND FEDERAL CONSTRUCTION CODES. CONTRACTOR SHALL c� r, <br /> uj <br /> INTERFACE WITH BUILDING INSPECTORS TO PROVIDE OWNER WITH FINAL <br /> ` SIGNED-OFF OF THE BUILDING PERMIT AT COMPLETION OF JOB, Exp, <br /> S CONTRACTOR SHALL FOLLOW ALL LOCAL, STATE, AND FEDERAL <br /> CONSTRUCTION CODES. CONTRACTOR SHALL COORDINATE UTILITY �TgO�CALIF���`� <br /> CONNECTION WITH PG&E,PAC-BELL,AND OTHERS,AS NECESSARY. <br /> DRAWN PR SHEET 1 OF 8 <br /> sEcoR PPFIR JAS OA RANCH MARK <br /> 23„eD 3DUTH SANTA FEROAD <br /> International DATE RIVERBANK cAL1FORSfA <br /> S 21AUG2001 TITLE SHEET AND <br /> Incorporated JOB NU SITE LOCATION MAP <br /> 077.43022,003 <br />