Laserfiche WebLink
3.3.2 Future Work <br /> Future work planned in the remainder of the Third Quarter 2005 includes the following tasks <br /> • Conduct weekly visits to change chart paper and inspect the operational status of the SVE, and <br />' • Perform monthly O&M for the SVE system <br /> r <br /> i <br /> f <br /> Project No S8643-06-01 -9- September 28 2005 <br />