Laserfiche WebLink
In addition to the dual-phase removal, Geocon is recommending to infect an oxygen release product <br /> into the saturated zone in the vicinity of MW-3 The oxygen release product will add dissolved <br />' oxygen to the groundwater over the proceeding six to twelve months The dissolved oxygen will <br /> enhance natural attenuation of the residual contaminants <br /> 1 Geocon recommends to continue with the quarterly groundwater monitoring program inclusive of <br /> wells MW-I through MW-5 and the sampling and analysis of all domestic wells (DW-2R, DW-3, and <br /> 1 DW-4) All other groundwater monitoring wells (MW-5D, AS-1, and MW-6 through MW-9) will be <br /> monitored for groundwater elevation only <br /> 1 <br /> 1 <br /> i <br /> i <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> i ` <br /> Project No S8643-06-01 -11- May 5 2005 <br /> 1 <br />