Laserfiche WebLink
' SVE/OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br />' Date � Tirne of Arrival <br /> achnician Time of Departure <br />' Site Engineer Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br />' Site Location Ranch Market 23569 South Santa Fe Road Riverbank CA <br /> Prosect No 58643-06-01 <br /> KVA C-Sparger Panel 120V/16 A 120 s are points stem <br />' Abatement Equip Solleco CA's Catal is Oxidizer Sena] No M1100 d071,97�f <br /> SVE Blower Elect Meter Reading <br />' Telemetry <br /> Electrical Power 230 V 3 phase—200 arna <br /> Supplemental Fuel ec � r <br />' No of KIO barrels at site Full Empty <br />' PART B Ozone Sparge System <br /> System up or down upon arrival Odors detected inside shed? <br />' dour Meter Reading T np read g inside shed <br /> Cycle Timer(rain) S-1 S-2 S-4 <br /> S-5 <br /> IS-6 S-7 - S-9 S-10 <br /> S-1 1 S-12 S-13 5-14 S-15 <br /> S16 S-17 5 18 S-19 S-20 <br /> PART B SVE SYSTEM DATA � f3—System up or down upon arrival ��/ (if down please c'o`mplete PART E) <br /> Haurnieter Reading f 7 , At time 0700 <br /> 00 <br /> Flow Data Before Ad ustment After Ad ustment I Final <br /> % Dilution air valve open <br /> Recirculation%open &J6 <br /> K/O Content al <br /> Vacuum @ blower(in H2O) <br /> Gau a Range 0-100 <br /> Total System Flow(A P, in H2O) <br /> P'Pe Size 6 " <br /> Well Field A6 Flow(d P, in H20) �r- <br /> Pipe Size 4" {{ <br /> Dilution Air Flow(Q P,"H2O) f <br /> pipe size o <br />