Quarter 2004 sample event No free product was observed during the First Quarter 2005 sample <br /> event, however, a product sheen was observed on the purge water and the water in the sample <br /> containers <br /> 33 Remediation System Operation and Maintenance and Performance Summary <br />' Operation and maintenance (O&M) of the remediation system is performed monthly (or as needed) <br /> Photo ionization detector(PTD) readings from the SVE effluent and influent is performed monthly as <br /> required by the San Joaquin Unified Air Pollution Control District (SJUAPCD) As required by <br /> ISJUAPCD, a chart recorder provides a continuous chart of the catalytic oxidizer temperature The <br /> chart paper is changed out on a weekly basis A brief description and performance evaluation of the <br /> remedial system for the reporting period is presented below <br /> 3 3 1 SVE System <br />' The SVE system is comprised of a skid-mounted 250-cfm blower and catalytic oxidizer (SCAT-250) <br /> with knockout pot manifolded to ten SVE wells (V-1 through V-10) During the reporting period, the <br /> SVE system was approximately 85% operational <br />' On December 9, 16, and 30, the chart paper was changed out On December 28, SVE wells V-5 and <br /> V-2 were shut down, and well V-3 was partially closed to transfer primary vacuum to well V-6 Well <br /> V-6 is located adjacent to groundwater monitoring well MW-3 SVE well V-6 was isolated to <br /> address free product issues in well MW-3 On December 30, the SVE system had shut down for two <br /> hours and restarted The vacuum in well V-6 was measured at 96 inches of water, a measured flow of <br />' 109 cubic feet per minute (cfm), and a PID reading of 71 parts per million (ppm) on the <br /> photoionization detector(PID) <br /> On January 4, Geocon mobilized to the site to collect the SVE influent and effluent samples for <br /> laboratory analysis and to adjust flows and vacuums on various wells to maximize contaminant <br /> 1 removal The PTD was non-functional and adjustments to the system could not be completed On <br /> January 5, the chart paper was changed out and no adjustments were made to the system again due to <br /> lack of an operating PID On January 6, the contaminant concentration, flow, and vacuum were <br /> monitored in extraction wells V2, V3, V5, and V6 Based on vacuum readings, flows, and PID <br /> readings well V-3 and V-6 were opened 100%, V-2 was opened 50%, and all other wells remained <br />' closed Wells V-2, V-3 and V-6 are each in the vicinity of well MW-3 The intent is to apply as <br /> much vacuum and flow in the region of MW-3 as possible to attempt to reduce or eliminate free <br /> product in the vicinity of MW-3 <br /> On February 1, Geocon mobilized to the site to collect the SVE influent and effluent samples for <br /> laboratory analysis and to adjust flows and vacuums on operating wells to maximize contaminant <br /> . removal The contaminant concentration, flow, and vacuum were monitored in extraction wells V2, <br /> Protect No 58643-06-01 -6- rebruary 14 2005 <br />