Laserfiche WebLink
SVEJOZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date T'imd of Arrival �O r <br /> echnician [J Time of Departure <br /> Stte Engineer- Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location Ranch Market 23569 South Santa Fe Road Riverbank CA Project No 5864.3-06-01 <br /> KVA C Sparger Panel 120V/16 A 120 s are oint system Serial foo M1104 <br /> Abatement EquEp__SoliecofCAT 59A Catalytic Oxidizer <br /> SVE Slower Elect Meter Reading <br /> Telemetry <br />' Electrical Power 230 V 3 phase—200 amp. <br /> Supplemental Fuel Clec&G <br /> INo of K/O barrels at site Full Empty <br /> PART B Ozone Sparge System <br /> System up or down upon arrival Odors detected inside shed. L. <br /> /°�� G' <br /> Hour Meter Reading_ _. SQ �� Temp reading inside shed <br /> Cycle Timer(min) S-1 S-2 S-3 S-4 S-S <br /> S-6 S-7 4 C- S-9 S-10 <br /> S-11 S-12 S-1314 S-15 <br /> S-16 S-17 S-18 S 19 S-20 /} <br /> PARTS SVE SYSTEM DATA oq ! f <br /> A <br /> System up or down upon arrival (If down please complete PART E) <br /> 7 _ <br /> Hourmeter Reading T [1 - At time 6120 <br /> Flow Data Before Adjustment After Adjus Final <br /> %Dilution air valve open r lrfC <br /> Recirculation%open G <br /> K/O Content <br /> Vacuum 0 blower(in H2O) <br /> Gau a Range 0-100 <br /> Total System Flow(A P,in HZO) _ <br /> -Pipe Size t " <br /> Well Feld Air Flow(A P,in H2O) <br /> Pipe Size 4" <br /> Dilution Air Flow(A P."H2O) <br /> Pipe size " <br />