My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008337
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:45:04 AM
Creation date
5/18/2020 11:09:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008337
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SVE/OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date 'y <br /> Time of Arrival f 3 OCt�'! <br /> echmcran �'/�C /°� Time of Departure <br />' Site Engineer Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location Ranch Market,23569 South Santa Fe Road,Riverbank,CA Project No 58643-06-01 <br /> KVA C-Sparger Panel 120V/16A/20spa[c1egqintsystern Senal No M1100 <br /> Abatement Equip00 a, <br /> SVE Blower_ MZ�42 Elect Meter Reading <br /> ___.. <br /> Telemetry <br /> Eleotdcal Power 230 V 3.phase-200 amp <br /> SUPPI <br /> ra <br /> sr a Full Empty <br />' PART B Ozone Sparge System / f <br /> System up or down upon amval C/ Odors detected inside shed? <br />' Hour Meter Reading Temp reading inside shed <br /> Cycle Timer(min) S-1 S-2 S� S-44 f -5 <br /> S-6 S-7 5-8 S-9 $ 0 <br /> S-11 S-12 5-13 S-14 S-15 <br /> S-16 S-17 S-16 S-19 S-20 <br /> PART B SVE SYSTEMS DATA <br /> System up or down upon arrival (if down please complete PART E) <br /> C <br /> Hourmeter Reading Z i(� At time s OQ�yj <br /> i} <br /> Flow Data Before Ad ustment After Ad ustment---� Final <br /> %Dilution air valve open <br /> Recirculation%open <br /> IVO Content al <br /> ' Vacuum ® blower(in H2O) <br /> Gauge Range 0-100 <br /> Total System Flow(A P,in H2O) <br /> PIP9 Size " <br /> Well Field Air Flow(A P, in H2O) <br /> Pipe Size 0 4" <br /> Dilution Air Flow(A P,"H2O) <br /> Pipe Size f <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.