Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION.............................................................................................................1 <br /> 2.0 SITE HISTORY................................................................................................................1 <br /> 21 Site Description 1 <br /> 22 Underground Storage Tank Removal 1 <br /> 23 Domestic Wells and Septic Fields 2 <br /> 24 Chronology and Previous Site Assessments 2 <br /> 3.0 PERMITTING/SITE-SPECIFIC HEALTH AND SAFETY PLAN............................4 <br /> 4.0 SOIL BORINGS, SAMPLING,AND WELL INSTALLATION.................................4 <br /> 41 Soil Borings 4 <br /> 42 Soil Sampling 5 <br /> 43 Soil Vapor Extraction and Ozone Sparge Well Installation 5 <br /> 44 Waste Profiling and Disposal 5 <br /> 5.0 RESULTS OF SAMPLING ANALYSIS.......................... .............................................6 <br /> 5 1 Results of Soil Sampling 6 <br /> 6.0 REMEDIATION SYSTEM INSTALLATION ACTIVITIES......................................6 <br /> 61 Remedial System Piping 6 <br /> 62 Soil Vapor Extraction and Ozone Sparge Remedial Equipment 7 <br /> 63 SVE System Startup 8 <br /> . <br /> 64 Ozone Injection System Status 8 <br /> 7.0 SUMMARY AND CONCLUSIONS................................................................................9 <br /> 71 Extent of Petroleum Hydrocarbons Adsorbed to Soil 9 <br /> 73 Recommendations and Future Work 9 <br /> 1 Wanch Market-RiverbanklReportslRB-Remed Well Install doc t SECOR International Incorporated <br />