My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 12:22:46 PM
Creation date
5/18/2020 11:17:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008342
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION.............................................................................................................1 <br /> 2.0 SITE HISTORY................................................................................................................1 <br /> 21 Site Description 1 <br /> 22 Underground Storage Tank Removal 1 <br /> 23 Domestic Wells and Septic Fields 2 <br /> 24 Chronology and Previous Site Assessments 2 <br /> 3.0 PERMITTING/SITE-SPECIFIC HEALTH AND SAFETY PLAN............................4 <br /> 4.0 SOIL BORINGS, SAMPLING,AND WELL INSTALLATION.................................4 <br /> 41 Soil Borings 4 <br /> 42 Soil Sampling 5 <br /> 43 Soil Vapor Extraction and Ozone Sparge Well Installation 5 <br /> 44 Waste Profiling and Disposal 5 <br /> 5.0 RESULTS OF SAMPLING ANALYSIS.......................... .............................................6 <br /> 5 1 Results of Soil Sampling 6 <br /> 6.0 REMEDIATION SYSTEM INSTALLATION ACTIVITIES......................................6 <br /> 61 Remedial System Piping 6 <br /> 62 Soil Vapor Extraction and Ozone Sparge Remedial Equipment 7 <br /> 63 SVE System Startup 8 <br /> . <br /> 64 Ozone Injection System Status 8 <br /> 7.0 SUMMARY AND CONCLUSIONS................................................................................9 <br /> 71 Extent of Petroleum Hydrocarbons Adsorbed to Soil 9 <br /> 73 Recommendations and Future Work 9 <br /> 1 Wanch Market-RiverbanklReportslRB-Remed Well Install doc t SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.