Laserfiche WebLink
i <br /> OZONE INJECTIONSOIL VEXTRA <br /> TION <br /> AND TREATMENT SYSTEM <br /> RANCH MARKET <br /> 23569 SOUTH SANTA FE ROAD <br /> RIVERBANK, CALIFORNIA <br /> GENERAL NOTES: EQUIPMENT SUP LIED BY OTHERS: <br /> THE SCOPE OF WORK INCLUDES INSTALLATION OF CONVEYANCE PIPING IN QUANTITY DESCRIPTION <br /> APPROXIMATELY 525 FEET OF UNDERGROUND TRENCH AND MOUNTING <br /> PROCESS EQUIPMENT FOR THE PURPOSE OF OZONE INJECTION AND 1 TRAILER-MOUNTED CATALYTIC OXIDIZER <br /> EXTRACTING AND TREATING SOIL VAPOR _ R _ —� �`�� - WITH VACUUM PUMP KNOCKOUT POT, <br /> } i <br /> THE WORK UNDER THIS CONTRACT INCLUDES FURNISHING ALL LABOR, � TRA�SFER PUMP AND CONTROL PANEL <br /> J <br /> MATERIALS,AND EQUIPMENT NOT SUPPLIED BY OTHERS TO CONSTRUCT THE -- 1 OZONE INJECTION BLOWER <br /> OZONE INJECTION AND SOIL VAPOR EXTRACTION SYSTEM, INCLUDING " '_�"- <br /> r fG-� 1 <br /> CONSTRUCTION AND INSTALLATION OF EXTRACTION WELL VAULTS, `-� -. t I 1 1, -GALLON POLY HOLDING TANK <br /> HEADWORKS, ELECTRICAL AND MECHANICAL. EQUIPMENT, EARTHWORKS, rs ` � � _�� r <br /> AND OTHER RELATED WORKTO PROVIDE A COMPLETE OPERABLE SYSTEM <br /> CERTAIN SPECIFIED ITEMS WILL BE SUPPLIED BYOWNER UNLESS OTHERWISE 3 <br /> NOTIFIED IN CONSTRUCTION DRAWINGS THE CONTRACTOR SHALL SITE , <br /> E t j <br /> COORDINATE DELIVERY OF THESE ITEMS WITH THE ENGINEER TO FACILITATE <br /> THE CONSTRUCTION SCHEDULE THE CONTRACTOR IS RESPONSIBLE FOR ° "`s, _ � <br /> ' " DRAWINGS INDEX; <br /> INSTALLATION AND TESTING OF THE ITEMSOW <br /> � o E <br /> PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL FIELD , K i 1 TITLE SHEET AND SITE LOCATION MAP <br /> DIMENSIONS AND EXACT LOCATION AND DEPTH OF EXISTING UTILITIES AND <br /> BURIED OBSTACLES, PROTECT IN PLACE, AND IF DAMAGED, CONTRACTOR �' r" 'W �� 4, ' 2 CONSTRUCTION NOTES <br /> SHALL REPAIR THEM AT NO ADDED EXPENSE TO OWNER.CONTRACTOR SHALL <br /> BE RESPONSIBLE FOR SUBSURFACE OBSTACLES ENCOUNTERED DURING 3 SITE PLAN WITH NW$SYSTEM LAYOUT <br /> EXCAVATIONS <br /> 4 TREATMENT OOMPOUND PLAN <br /> CONTRACTOR SHALL BE REQUIRED TO SAW CUT EXISTING CONCRETE AND <br /> ASPHALT IN A NEAT STRAIGHT LINE, AND REPLACE SURFACE WITH SIMILAR •� ..� . - ��" 5 PIPING DETAILS <br /> MATERIAL UPON COMPLETION REMOVAL AND RESTORATION OF PAVEMENT <br /> g SHALL NOT BE AN INTERRUPTION TO TRAFFIC IN THE THOROUGHFARE •_ - _• COMPOUND DETAILS <br />�7 SPECIAL.CONDITIONS, USE OF TRENCH PLATES,AND HOURS OF OPERATION <br /> TOBEADDRESSEDDURINGJOBWALK. SITE LOCATION MAP Q� fi (ss Z ELECTRICAL ETAILS <br /> CONTRACTOR SHALL INSTALL ALL PIPING AND CONDUIT,ACCORDING TO ALL SCALE 1' =2,000 FEET ��`' 3.,)6,0t0 8 PROCESS AND INSTRUMENTATION DIAGRAMS <br /> LOCAL, STATE,AND FEDERAL CONSTRUCTION CODES CONTRACTOR SHAH. <br /> INTERFACE WITH BUILDING INSPECTORS TO PROVIDE OWNER WITH FINAL Cr. <br /> SIGNED-OFF OF THE BUILDING PERMIT AT COMPLETION OF JOB * EV 10 yk <br /> CONTRACTOR SHALL FOLLOW ALL LOCAL, STATE, AND FEDERAL <br /> CONNECTIO CONSTRUCTION WITH PG&E,PAO-BELL,AND OTHERS.AS NE ESSARYE UTILITY sTA�OF C <br /> o�wN PR SHEET 1 OF 8 <br /> SECOR p JAS �g,� ��e� <br /> International pNSPEMK cwFOMVa <br /> Incorporated 21 AU02001 TITLE SHEET AND <br /> JOB Na SITE LOCATION MAP <br />