Laserfiche WebLink
' + MW-8 <br /> 1 <br /> 1 <br /> I LEGEND <br /> FORMER UST <br /> 17 A V-1 SOIL VAPOR EXTRACTION WELL LOCATION <br /> �T VAS-1 AIR SPARGE WELL LOCATION <br /> • B--1 SOIL BORING LOCATION <br /> U GP-3 GEOPROBE LOCATION <br /> +MW-1 MONITORING WELL LOCATION <br /> i � 16 03 PROPOSED OZONE SPARGE WELL LOCATION <br /> A V-7 PROPOSED SVE WELL LOCATION <br /> fir <br /> 18 — \��. rr„r•—"�'�` i------ UNDERGROUND EXTRACTION/INJECTION PIPING <br /> rPOLEPOWERrrr.r*� OVERHEAD ELECTRICAL <br /> UNDERGROUND ELECTRICAL <br /> �� - �~a rr''�rr 1 'v - UNDERGROUND GAS UNI <br /> _rrrYrr,lr"� •�'•' rJ +; DW-� t — UNDERGROUND PHONE LINE <br /> UNDERGROUND WATER LINE <br /> -rr Yr rrr .�rr'rr 'rA t•, . 3 ss — UNDERGROUND SANITARY SEWER <br /> SEPTIC <br /> TANK <br /> PROPOSED POWER POLE <br /> ('jN �•�` ss (AND 60 FOOT <br /> PROPOSED 5 PSI C �-ss <br /> 1� 19 NATURAL GAS LINE ss --�ss ti CONNECTION LINE) <br /> GP-2 I <br /> GAS V7 <br /> 21 ++ METER ]4 <br /> PROPOSED COMPOUND LOCATION <br /> VS -�- MW-2 ++ <br /> +S � + <br /> 7 <br /> MW-5 <br /> CONCRETE �� V—t V,� t 5 <br /> 1 <br /> � V-5 PAD 'Av V-3 + <br /> MW-5D + -a+ 4� -�'_e= ` ++ t t GP-3 O <br /> SB-2• ���� ++ SB-1 ,[ 1 �f -z PG&E + <br /> r + —���� �► - SIGN BOX ; <br /> 22 �QROFESsj <br /> FORMER TJ�NK PR ; �Q• .((� 8 <br /> 1 <br /> V—] � � %12 ��J to-u, <br /> 899 North <br /> CML P 0 20 40 <br /> 6 MW-4 ON �Of CAUf <br /> 23SCALE (FEET) <br /> V 10 f <br /> +`� V9� o ° SES SHEET 3 OF 8�° _ <br /> �SECORJSA �t✓ s�rn <br /> ���-t —• oei CAUPOFM <br /> 22AUG2001Incastd SITEP_AN WITH <br /> r• �• ` �'' 077.43622.003 SVE/OS SYSTEM LAYOUT <br />