Laserfiche WebLink
TAI& <br /> PROPOSED WELL&SOIL BORING COMPLETIONS <br /> Ranch Market <br /> 23569 South Santa Fe Road <br /> Riverbank,California <br /> wmiko <br /> W, <br /> $0PA) (feei� <br /> h <br /> Ozone Sparge Wells <br /> S-1 I New well located onsite 38 6 125 35 to 38 3 33 to 38 5 33 to 31 2 6 <br /> S-2 1 New well located onsite 38 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> S 3 1 New well located onsite 38 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> S4 I New well located onsite 38 6 125 35 to 39 3 33 to 38 5 33 to 31 2 R <br /> S5 I New well located onsite 38 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> S-6 I New well located onsite 38 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> S 7 1 New well located onsite 38 6 1 25 35 to 39 3 33 to 38 5 33 to 31 2 R <br /> S-8 I New well located onsite 39 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> S9 1 New well located onsite 38 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> S-10 I New well located onsite 38 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> S 11 1 New well located onsite 38 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> S 12 1 New well located onsite 39 6 1 25 35 to 38 3 33 to 38 5 33 to 31 2 R <br /> J R <br /> 17 New Nested Sparge Wells 456 36 60 <br /> Assume the ozone sparge unit will be supplied by KVA The unit will be equipped with an oxygen boosting unit and be able to supply 6 cfm <br /> R=(A controler will be provided that will supply 6 cfm of ozone to one well at a time and <br /> rotate injection of ozone to each of the 12 wells) <br /> III <br /> File Ranch Markct\Tables\RB-SVE OZ Weis xls Page 2 of 2 <br />