Laserfiche WebLink
TABLE 1 <br /> Remediation Feasibility Matrix <br /> Ranch Market <br /> 23596 South Santa Fe Road <br /> Riverbank California <br /> v.Estimirated <br /> ation oftion 3,` G'° Nutatl of Estimated Upftou <br /> Events Costa Cost Feastble9 <br /> Option 6 Soil Vapor Extraction,Air Sparging,and Groundwater Extraction <br /> 5 years Monitoring and Sampling $20000 5 $100000 Yes <br /> Subtotal $100,000 <br /> System Installation Costs 1 GWE 4 SVE and 6 AS Wells Assume 25 rom Flow <br /> 1 report Final Remediation Plan $4000 1 $4000 <br /> 1 event Permit Preparation and Work Plan SI 500 1 $1 500 <br /> 1 wells Pernut SJCEHD Weil Instail Permits $120 1 $120 <br /> 1 event Well Installation 10 SVE&5 AS Wells $10500 1 $10500 <br /> 1 event Well Installation(1) 6 inch Diameter GWE $3250 1 S3250 <br /> I report Well Installation Report $1500 1 $1500 <br /> Subtotal $20,870 <br /> SVEtASIGWE System Installation Costs <br /> 1 event Permit-SJAPCD Permit to Operate $1000 1 $1000 <br /> 1 event Permit-NPDES.Water discharge $2,000 1 $2,000 <br /> l event Permit County&City Building Permit $1000 1 $1000 <br /> 1 event Labor to obtain all permits $2000 l $2000 <br /> l event Labor for Engineering Design Plans $4000 I $4000 <br /> 1 event Labor for Bid Package and Job Walk $2500 1 $2500 <br /> 1 event PG&E Temp Service Fee $20,000 l $20000 <br /> 1 event System Installation $80000 1 $80000 <br /> 1 event Equipment Purchase $75000 1 $75 000 <br /> I event System Start-up $5,000 1 $5,000 <br /> Subtotal $192,500 <br /> Annual System Operation Costs 1 G WE 10 SVE and 7 AS Wells 25 m <br /> 3 years Operations and Mamtenance $45000 3 $135,000 <br /> 3 years Utility Charges for gas and power $15000 3 $45000 <br /> 3 years Air Discharge Permit Fees $200 3 $600 <br /> 3 years NPDES discharge Permit Fees $2000 3 $6000 <br /> 3 years Labor For Permit Renewal $1000 3 $3000 <br /> Subtotal $189,600 <br /> CLOSURE COSTS <br /> I report Closure Report and Well Dest Work Plan $2500 1 $2500 <br /> 5 parcels Permit-SJCEHD Well Destruct Permits $100 5 $500 <br /> wells death Wells to be Destroyed Fee <br /> 9 40 Groundwater Monitoring Wells $11 360 $3,960 <br /> 1 70 Deep Groundwater Monitoring Well $11 70 $770 <br /> 10 30 Soil Vapor Extraction Wells $11 300 $3300 <br /> 7 45 Air Sparge Wells $11 315 $3465 <br /> 1 50 Groundwater Extraction Well $15 50 $750 <br /> 1 event Disposal of well boxes and surface soil $400 1 $400 <br /> 5 days Field Oversight&Coordination $900 5 $4500 <br /> 1 report Well Destruction Summary Report $1000 1 $1000 <br /> Subtotal $21,145 <br /> SVE/AS and GEW Remediation Costs $524,115 <br /> This option will remove gasoline adsorbed to sod in the vadose zone and dewatering will removed gasoline dissolved in <br /> groundwater and adsorbed to soil in the saturated zone <br /> Extraction of groundwater will also control the migration of dissolved hydrocarbons downgradient of the tank pit <br /> Air spargmg will also enhance m-situ destruction of gasoline be increasing the aerobic bacterial activity <br /> File Ranch%Tables\PAR Cost Est1RM-Remedianon Matrix xis Page 4 of 4 <br />