My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008375
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:38:30 AM
Creation date
5/18/2020 11:26:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008375
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Remediation Feasibility Matrix <br /> Ranch Market <br /> 23596 South Santa Fe Road <br /> Riverbank California <br /> Estimated <br /> Duration of Tush Cost Number of Estimated Option <br /> Remediation Events Costs Cost Feasible? <br /> Option 4 Soil Vapor Extraction and Air Spargmg <br /> 5 years Monitoring and Sampling $20000 5 $100000 Yes <br /> Subtotal $100,000 <br /> System Installation Costs,4 SVE and 6 AS Wells_ <br /> 1 report Final Remediation Plan $3000 1 $3000 <br /> l event Permit Preparation and Work Plan $1 500 1 $1 500 <br /> 1 wells Permit SJCEHD Well Install Permits $120 I $120 <br /> I event Well Installation 10 SVE&5 AS Wells $10500 1 $10500 <br /> l report Well Installation Report $1 500 1 $1 500 <br /> Subtotal $16,620 <br /> SVE/AS System Installation_Costs <br /> I event Permit SJCAPCD Permit to Operate $1000 1 S1000 <br /> 1 event Permit-County&City Building Permit $1000 1 $1 000 <br /> 1 event Labor to obtain all periruts $2,000 1 $2000 <br /> 1 event Labor for Engineering Design Plans $3,000 1 $3000 <br /> 1 event Labor for Bid Package and Job Walk $2000 1 $2000 <br /> l event PG&E Temp Service Fee $20000 1 $20,000 <br /> 1 event System Installation S70000 1 $70000 <br /> 1 event Equipment Purchase $50000 1 $50000 <br /> 1 event System Start-up S5000 1 $5,000 <br /> Subtotal $154,000 <br /> Annual System Operation Costs,10 SVE and 7 AS Wells <br /> 3 years Operations and Maintenance $35,000 3 $105,000 <br /> 3 years Utility Charges for gas and power $15000 3 $45,000 <br /> 3 years Air Discharge Permit Fees $200 3 $600 <br /> Subtotal $150,600 <br /> CLOSURE COSTS <br /> 1 report Closure Report and Well Dest Work Plan $2,500 1 $2,500 <br /> 5 parcels Permit-SJCEHD Well Destruct Permits $100 5 $500 <br /> wells depth Wells to be Destroy-ed Feet <br /> 9 40 Groundwater Monitoring Wells $11 360 $3,960 <br /> 1 70 Deep Groundwater Monitoring Well $11 70 $770 <br /> 10 30 Soil Vapor Extraction Welts $11 300 $3300 <br /> 7 45 Air Sparge Wells $11 315 $3,465 <br /> 1 event Disposal of well boxes and surface soil $400 1 $400 <br /> 4 days Field Oversight&Coordination $900 4 $3,600 <br /> 1 report Well Destruction Summary Report $1,000 1 $1,000 <br /> Subtotal $19,495 <br /> SVE/AS Remediation Costs $440,715 <br /> This option will remove gasoline adsorbed to soil in the vadose zone <br /> Air sparging will remove gasoline dissolved to groundwater and adsorbed to soil in the saturated zone <br /> Air spargmg will also enhance in situ destruction of gasoline be increasing the aerobic bacterial activity <br /> This option will not address the offsite migration of dissolved gasoline range petroleum hydrocarbons <br /> File RanchlTableslPAR Cost Est1RM Remediation Matrix Table xls Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.