Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION.............................................................................................................1 <br /> 2.0 SITE HISTORY................................................................................................................1 <br /> 3.0 PERMITTING/SITE-SPECIFIC HEALTH AND SAFETY PLAN............................2 <br /> 4.0 SOIL BORINGS, SAMPLING, AND WELL INSTALLATION.................................2 <br /> 41 Soil Bonngs 2 <br /> 42 Soil Sampling 3 <br /> 43 Lithology 3 <br /> 44 Monitoring Well Installation 4 <br /> 45 Quarterly Groundwater Monitoring and Sampling 4 <br /> 45 1 Groundwater Monitoring 4 <br /> 4 5 2 Well Development Procedures 5 <br /> 453 Groundwater Sampling Procedures 5 <br /> 5.0 ANALYTICAL RESULTS...............................................................................................5 <br /> 5 1 Results of Soil Sampling 5 <br /> 52 Results of Groundwater Monitoring and Sampling 6 <br /> 6.0 SENSITIVE RECEPTOR SURVEY...............................................................................6 <br /> 61 Map Review 6 <br /> 62 Department of Water Resources Records Review 6 <br /> 63 Field Search <br /> 7.0 SUMMARY AND CONCLUSIONS................................................................................7 <br /> File R-we111nsta11&M&S rpt doc SECOR international incorporated <br />