Laserfiche WebLink
JOB NAME Ranch Market JOB NUMBER 077 42006 003 Well Install <br /> CONTACT Mr Nagi Saleh Ali 209-545-397 DATE PREPARED 07/26/00 Jaff Auchterlonte <br /> DRESS 23569 Santa Fe Road SAMPLED BY <br /> Riverbank CA 95367 SAMPLE DATE 819A,e -/V r, so <br /> file WorkRequestlRB-Well Install-1 As <br /> Drill & INSTALL 5 WELL TO 40 FEET BGS AND 1 WELL TO 26 FEET BGSAoD I pe,,t.,,.x, To 21 gifts <br /> USA Ticket#197845 <br /> 1) Arnve at site- Review 1)SSP:21 Work order Conduct tailgate safety meeting with driller <br /> Inspector- Mike Infurna, San Joaquin County 209-468-3454 <br /> 2 Drilling order(MWA MW-7, MW-8, MW-6, MW-5,and MW-5D <br /> Tag Depth to water in the onsite welt, MW-2, record de the in attached data table <br /> Hand auger and dig with post holer to 5 feet to clear utility -_- <br /> Drill hole using 8"diameter to a total depth of 40 feet bgs <br /> Drill hole using 8"diameter to a total depth of. feet bgs for MW-5D the deep well _ <br /> Using Split Spoon Sampler collect discrete soil samples as shown on Attached Table _ <br /> Note the initial and static water encountered in each soil boring <br /> 3) GRAB WATER SAMPLE- MW-6, MW-8,and MW-9 MW-j-..i ;' --3 <br /> Run in hole at 35 feet with Simulprobe sarnpler, collet Ing soil sample from 35 to 36 5 feet bgs <br /> Release pressure on water sampler and allow water to enter screen <br /> Pull out of hole and transfer water sample into 40 mil VOAS <br /> 4) Place all cuttings in area south of the Ranch Market- Place cuttings from each boring in discrete piles <br /> We will collect profile samples when all drilling as been completed <br /> 5) Complete well per the attached Table <br /> Surge and bail well while setting sand pack to remove sediment <br /> Note that MW-8 will be installed in vacant field and will need a Stove Pipe Completion <br /> The stove pipe should protected by three ballards <br /> 6)6 Measure location and size of drilling cutting piles from each boring, note on Site Plan <br /> Measure location of Soil Borings and post on Site Plan <br /> Photograph the stockpiled soil and well locations <br /> 7) Fill out COC and Analyze soli as shown below and detailed on attached table <br /> #Samples # and Type of Container Analytical Method <br /> SOIL 21 samples 1 Brass Sleeves BTEX,TPH ,and MtBE via EPA method 8260B <br /> Water .a'i samples 4 40 ml VOA BTEX,T131-19,Oxygenates,EDB, 1-2,DCA via EPA method 8260E <br /> 8) Fill out COC per directions given above for Kiff Labs Contact Joel Kiff (530)297-4800 <br /> Call lab and schedule sample pick-up 720 Olive Drive, Suite D <br /> 1 week TAT Davis, CA 95616 <br /> 9 Provide on finals of all notes and COC's to Jaff Auchterlonie in Sacramento ASAP. <br /> EQ1I)IPM6T NEEDED. 3 <br /> 3 , <br /> Health& Safety Site Plan Traffic Control cones 40 Brass Sleeves <br /> 40 ml VOA's preserved (HCI) (none)500 ml Amber Bottles (1) Coolers with Ice <br /> Water level meter, (4)Slim Hole Disposable Bailers, (2)5 gallon plastic buckets with lids, COC's, Drum labels, etc <br /> 112",9116', and 15116"sockets,and other mist tools Camera and Film <br /> NERAL INFORMATION ' <br /> erect all questions to Jaff, 916 861-0400 ext 223 or Page 916-697-2021 <br /> PROJECT MANAGER, Jaff Auchterionie AUTHORIZATION <br />