Laserfiche WebLink
Site Safety and Health Plan 1 Terracon <br /> ±19.41 Acres Vacant Land ■ Manteca, California <br /> June 12, 2017 ■ Terracon Project No. NB177049 <br /> TITLE NAME PHONE <br /> Project Manager Scott Gable 916-335-3856 <br /> Safety and Health Director Scott Gable 916-335-3856 <br /> Site Safety Officer Tamara Woods 209-712-7159 <br /> Staff Scientist Sadie Bodiford 831-281-0038 <br /> Assistant Geologist Melissa Kosla 925-222-3007 <br /> Terracon Client Contact Todd Berryhill 510-899-8302 <br /> CH Realty Client Contact Annmar aret Connolly ## <br /> 3.0 MEDICAL SURVEILLANCE REQUIREMENTS <br /> All Terracon personnel participating in field operations on this project will be enrolled in a health <br /> monitoring program in accordance with the provisions of OSHA 29 CFR 1910.120 and 1910.134. <br /> Each project participant must be certified by a Doctor of Medicine as fit for respirator and semi- <br /> permeable/impermeable protective equipment use. The content and frequency of physical <br /> examinations will be determined by the Consulting physician in compliance with the requirements <br /> of 29 CFR 1910.120. <br /> Follow-up medical examinations will also be provided in the event of illness or unprotected <br /> exposure to contaminants in excess of eight-hour time weighted average permissible exposure <br /> limits. <br /> 4.0 EMPLOYEE TRAINING REQUIREMENTS <br /> All Terracon field personnel must have completed 40-hour Hazardous Waste Operations Training <br /> per the requirements of OSHA 29 CFR 1910.120. In addition, a current 8-hour annual refresher <br /> training certificate will be required for all field personnel. <br /> Prior to the start of site activities, the SSO will conduct a pre-project safety and health briefing for <br /> all project participants. The personnel responsible for project safety and health will be addressed, <br /> as will site history, scope of work, site control measures, emergency procedures and site <br /> communications. The briefing will address site contaminants, air monitoring protocols and results <br /> and the level of personal protective equipment to be employed for each project task. <br /> Daily "tailgate" safety and health briefings will be presented by the SSO at the start of each work <br /> day. In addition to a general review of the proposed daily activity and safety requirements, the <br /> results of previous air monitoring and any procedural changes will be addressed. A daily tailgate <br /> safety meeting documentation form is attached as an Appendix to this plan. <br /> 5.0 RESPIRATORY PROTECTION PROGRAM <br /> All respirators employed by Terracon personnel will be NIOSH approved. Cartridges and filters <br /> for air purifying respirators will be appropriate for the contaminant(s) of concern. Cartridge/filter <br /> 5 <br />