My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
321
>
2900 - Site Mitigation Program
>
PR0541977
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:48:39 AM
Creation date
5/18/2020 11:37:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541977
PE
2950
FACILITY_ID
FA0024091
FACILITY_NAME
VACANT LAND
STREET_NUMBER
321
STREET_NAME
SPRECKELS
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22121020
CURRENT_STATUS
01
SITE_LOCATION
321 SPRECKELS AVE
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u 3 <br /> Site Safety and Health Plan <br /> ±19.41 Acres Vacant Land ■ Manteca, California lrerracon <br /> June 12, 2017 ■Terracon Project No. NB177049 <br /> rinse. The Project Manager is responsible for determining if decontamination solutions must be <br /> containerized. If so, a decontamination sump or polyethylene sheeting and fluid containers will be <br /> mobilized and established in the decontamination area. Decontamination of hand samplers and <br /> similar small equipment will be performed at a designated location within the Contaminant <br /> Reduction Zone. Decontamination of such equipment will consist of detergent solution wash and <br /> clean water rinse. <br /> 12.3 Power Washer/Decontamination Safety <br /> The operator should wear safety glasses or a face shield at all times during use of the power <br /> washer. Caution should be used while operating the washer to ensure that all Site personnel <br /> are out of the area. <br /> 13.0 SITE COMMUNICATIONS <br /> Communication between personnel within the Exclusion Zone will be via verbal communication <br /> or hand signals. Visual contact between members of task teams should be possible throughout <br /> the course of project activities. Contact with the SSO will be through direct verbal communication. <br /> The following hand signals will be used by personnel wherever respiratory protection and/or <br /> equipment noise limit verbal communication. <br /> Signal Meaning <br /> Thumbs Up OK; all is well <br /> Grab throat with both hands Can't breathe <br /> Shake head, thumbs down NO, negative <br /> Point right (when facing equipment operator) Move/steer left <br /> Point left(when facing equipment operator) Move/steer right <br /> Grab partner's wrist Grab partner's wrist <br /> 14.0 EMERGENCY RESPONSE PROCEDURES <br /> The Project Manager is responsible for obtaining and recording the following emergency <br /> information prior to site mobilization: <br /> Location of Nearest Telephone Personal cellular phone <br /> Nearest Hospital/Clinic Doctors Hospital of Manteca <br /> 1205 E. North Street <br /> Manteca, CA 95336 <br /> Estimated Drive Time 4 minutes <br /> Directions From Site North <br /> Ambulance 911 <br /> WorkCare (Managed Care Provider) 209-823-3111 <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.