My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2900 - Site Mitigation Program
>
PR0542399
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:17:17 PM
Creation date
5/18/2020 2:15:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542399
PE
2960
FACILITY_ID
FA0024361
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
209240024
CURRENT_STATUS
01
SITE_LOCATION
14700 SCHULTE RD
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION PROGRAM CHECKLIST <br /> SITE LOCATION: 7 <br /> FAM u v t PR# O sal ti °Ipl J <br /> DATE ACTIVITY INITIAL <br /> S Review submittal and make sure all documents/fees have been submitted.. <br /> Request documents/fees not submitted. j?taJi+J 041 1 �epdn <br /> Provide MFR to Accounting to ensure project has a FA#an a #. The PR#for a <br /> project does not change. If the lead agency changes, a new PR# must be created under <br /> the existing FA. <br /> Issue SR for Work Plan Review—Enter the data into the SR form in EC making sure <br /> to link the SR to the related FA. Generate an SR#and document on the permit form. If <br /> no permit form has been submitted, record the information on a golden rod Service �( <br /> Request form. Use this SR#on your DAR to track time spent obtaining documents/ L"I <br /> fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br /> subsequent report/sample results, making notifications/referrals. <br /> `LItS Work Plan SR#: d 0,%50. LX <br /> Review Work Plan to ensure scope of work matches the scope of work approved by <br /> IZ S the lead agency and that the mw construction/destruction meets SJC Ordinance Code <br /> j and well standards. <br /> Issue Permits- Enter permit information into WP form in EC, link to the FA#for the <br /> 12,it's project, and obtain a WP#. Use this WP#on DAR to track time spent in the field for the <br /> specific mw/boring activity specified on the permit. / <br /> ati t WP#: 00 311OLI Scope: l ovvrrn ' <br /> WP#: Scope: <br /> WP#: Scope: <br /> WP#: Scope: <br /> WP#: Scope: <br /> After scope of work on the well and boring permit WPs are complete, update the <br /> following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br /> Status—choose 'Finaled'; Final Inspection —enter date permit f naled. <br /> After all field work is complete, flag calendar to follow up on report of findings. <br /> Report Review: <br /> • Environmental Assessment Projects-Review report to determine if <br /> contamination was found. If contamination present, print out a 5021 and request a <br /> new PR#be issued under PE 2960. Provide 5021 to Accounting Office for <br /> processing. Complete a Prop 65 Notification. Send notification letter to CVRWQCB. <br /> • EHD Lead Oversight Projects -Review report to determine next phase of work to <br /> be conducted or if closure is appropriate. Complete Prop 65 for any new <br /> contaminants found at the site. <br /> • Other Lead Agency Projects -Review report to determine if any immediate public <br /> health issues are found. If public health concerns are found, notify supervisor <br /> immediately for follow up and further notifications. Complete Prop 65 for any new <br /> contaminants found at the site. <br /> After scope of work for the project SR is complete, update the following fields in the <br /> Service Request Approval Dates section of the SR form in EC: Plan Status—choose <br /> 'Finaled'; Final Inspection—enter date work finalized. <br /> EHD-29 8116117 Site Mitigation Program Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.