My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:49:26 PM
Creation date
5/18/2020 2:22:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Richard Callistro September 21, 1994 <br /> San Joaquin County Capital Projects Page 6 <br /> The contingency of 5% of the total proposed labor has been included to cover potential working <br /> restrictions related to drilling in the congested downtown Stockton area. This contingency may <br /> also cover the costs of disposal of soil cuttings and purge waters generated by the investigation <br /> and monitoring work. It is proposed to temporarily store these materials in 55 gallon drums at <br /> the site until the analytical results are available which will determine how the materials can be <br /> disposed. <br /> Schedule <br /> WESTON can proceed with this project within two weeks of receipt of written authorization to <br /> proceed. The total elapsed time from authorization to proceed to submittal of the draft final <br /> report to Capital Projects is 10 weeks. <br /> Business Arrangements <br /> WESTON is offering to complete the work detailed above based on the WESTON General <br /> Terms and Conditions presented in Attachment 1. All work is proposed to be completed on a <br /> time and materials basis utilizing the Total Estimated Budget amount as a ceiling which will not <br /> be exceeded unless specifically approved in advance by Capital Projects. Invoicing will be on <br /> a monthly basis and will be provided to the level of detail shown on Attachment 2. <br /> Should a higher level of detail or extensive backup documentation be required, WESTON can <br /> provide any level of detail needed but at extra cost which can be negotiated in advance. <br /> Should you have any questions regarding this proposal or the general approach suggested, please <br /> do not hesitate to call me. In the meantime, we appreciate the opportunity to provide this <br /> proposal and look forward to again working with Capital Projects. <br /> Sincerely, <br /> ROY F. ,WESTON, INC. <br /> PAX v <br /> Paul V. Sundberg <br /> Sr. Project Director <br /> PVS/cmc <br /> Attachments <br /> Sf K W R OPOSAUCLLMRO.W P <br />
The URL can be used to link to this page
Your browser does not support the video tag.