Laserfiche WebLink
Now ., <br /> Ms. Mary Meays October 15, 1993 <br /> San Joaquin County Public Health Services Page 2 <br /> Per the direction of the EHD letter to San Joaquin County Capitol Projects dated February 17, <br /> 1993, analyses for TPH-D, EDB and Total Lead were conducted for a period of two calendar <br /> quarters. Since only very low or non-detectable concentrations of these compounds were <br /> detected, these analytes were deleted from the scheduled analyses for this and future sampling <br /> periods. <br /> Should you have any questions, please feel free to contact me in the Stockton office. <br /> Sincerely, <br /> ROY F. WESTON, INC. <br /> Robert M. Sengebush, R.G. <br /> Project Manager <br /> RMS/cmc <br /> Enclosure <br /> cc: Mr. Dick Callistro - SJC Capitol Projects <br /> Ms. Elizabeth Thayer - California Regional Water Quality Control Board - Sacramento <br /> Sf "s LTR WU ys.wn <br />