My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:49:26 PM
Creation date
5/18/2020 2:22:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUS; 13 '90 07:54 CAO F'ROJEC7S ` P.3 <br /> • �A� rI <br /> w <br /> As noted above, this cost est+mate is for the completion of the <br /> cntir scope of work as defined by the County approved work plan. <br /> Duping our previous telephone conversation, you rexaested that an <br /> estimate be provided without the costs for the. installation and <br /> sampling of monitoring wsll NW-4, which is to be located at the <br /> southwestern corner of the building site. If this well is not <br /> i.nntalle<1 at the time of thr rest of the work, the estimated budget <br /> will dcercasc to $45,677, a decrease of $49M. special mention <br /> ,,huuld be made, however, that due to the nobitization and costs <br /> incurred due to extra site visits, the estimated oust for install- <br /> ing and sampling MW-4 at a later date will be approximately $7900. <br /> Schedule <br /> The schedule for this project will remain as is shown in the Work <br /> Pian. it is anticipated that the field work could begin within two <br /> to three weeks following your authorization to proceed. Availabil- <br /> ity of the drilling subcontractor during the busy summer months <br /> will be the determining factor in the mart-up. <br /> Due to the uncertainties involved in well installation work in <br /> confined locations, WESTON proposes to perform this work on a time <br /> and materials basis, working againot the authorised budget estimate <br /> as a predetermined not-to-exceed-ceiling. While the estimate is <br /> not a guarantee of price, it is ttc. cost which WESTON fully expects <br /> to be able to complete the scope of work proposed assuping average <br /> drilling conditions. As implied by the not-to--exceed-ceiling, <br /> WESTON would not exceed the budget estimate without additional <br /> authorisation. This may happen when rite conditions or a client's <br /> request forces a change in the scope of work. Regarding other <br /> business terms, WESTON's General Terms and conditions are enclosed <br /> and are hereby made a part of this proposal. <br /> Should you have any questions, please do not hesitate to call me or <br /> Mr. Paul Sundberg at WESTON's Stockton office. <br /> Sincerely, <br /> FOY F. WESTON, INC. <br /> Erik A. Friodrich, N.E.A. , R.E.P. <br /> Project Manager <br /> EAF/Cmc <br /> - Enclosure <br /> _. i <br />
The URL can be used to link to this page
Your browser does not support the video tag.