Laserfiche WebLink
t <br /> SECTION 5 <br /> SCHEDULE <br /> i <br /> w� Table 5-1 outlines the proposed schedule for implementing the <br /> t field investigation and submitting the Phase II Groundwater <br /> Investigation Report. The schedule is projected in weeks after <br /> written authorization to proceed is received by WESTON. <br /> 11 <br /> :a <br /> Task WEEKS <br /> 1 2 3 4 6 S 7 8 S 110 11 12 13 14 15 16 17 10 19 20 21 22 <br /> 2 <br /> Regulatory Approval <br /> I <br /> `R <br /> Literature Search <br /> I a <br /> Well Installation and Destruction <br /> i <br /> ». Groundwater Sampling <br /> Tid_.I Influence Study <br /> Aquif,r Characteristics Study <br /> Data Evaluation <br /> Final Report <br /> i <br /> � � s <br /> ✓' Report Review - <br /> I:I Report Submittal <br /> ? i <br /> TABLE 5-4 <br /> r <br /> WORK SCHEDULE <br /> } PHASE II GROUNDWATER INVESTIGATION ±" <br /> � a <br /> M <br /> ,. <br /> 5 - 1 <br />