I <br /> 0.,a <br /> E. Arrangements with Public Safety Agencies <br /> R The Health and Safety Plan developed by WESTON will require <br /> notification of local public safety agencies and medical <br /> w facilities to advise them of the character and schedule of <br /> i <br /> the excavation project. <br /> 5.0 FINAL PROJECT REPORT <br /> c <br /> t At the conclusion of the project, a final report will be compiled <br /> to document the general field operations as well as the handling <br /> and disposition of the excavated soils. In addition, the final <br /> report will discuss the sample analysis as well as the pump test <br /> results. <br /> 6.0 IMPLEMENTATION SCHEDULE <br /> Upon receipt of the Regulatory Agency approval for this Final <br /> Remedial Plan, WESTON will require 10 working days to mobilize. <br /> � = Once mobilized, the initial excavation will be completed within <br /> five days and the entire excavation, should it extend to the <br /> maximum extent, will require 15 working days. y <br /> Upon completion of the excavation, 20 working days will be <br /> required to complete the final report for submittal. <br /> �-3 <br /> int <br /> i <br /> r ! <br /> _ t <br /> - 14 <br /> i <br /> em. <br />