Laserfiche WebLink
lc Table 1 - Schedule of Work Completed <br /> 1215 JW 12/7 12/8 1213.2 12/13 )--2/14 12Z15 <br /> BH1 OX <br /> BH2 OX <br /> BH3 0 X <br /> BH4 OX <br /> BH5 O X <br /> BIi 6 O X <br /> BH7 0 X <br /> BH8 O X <br /> BH9 0 X <br /> r-- BH10 O i <br /> BH11 0 X <br /> BH12 0 X <br /> MW1 0 XX <br /> MW2 0 XX <br /> -A NW3 0 XX <br /> + ALegend: 0 - drilled, X - grouted, XX - constructed and grouted <br /> k,a Table 2 - Borehole Elevations (approximate) and Depths drilled <br /> 12 <br /> Ground Surface Total Depth <br /> Elevation Drilled <br /> 1 Borehole Depth Drilled (above M.S.L.)* Below Street Level <br /> } Blil 25' 95 30 <br /> BH2 20' 94 26 <br /> BH3 30' 95 35 <br /> BH4 30' 100 30 <br /> BH5 251 93 32 , <br /> (' BH6 35' 100 35 <br /> BH7 40' 99 41 <br /> BHB 35' 100 35 f <br /> BH9 35' 100 35 <br /> BH10 35' 95 45 <br /> BH11 35' 100 35 <br /> a BH12 251 93 32 <br /> a * Elevation is relative to sidewalk :Level which is arbitrarily <br /> established as 100 feet above mean sea level (MSL) . <br /> f , <br />