My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012626
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0012626
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:03:14 PM
Creation date
5/18/2020 2:45:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012626
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> 5.1 )Exploratory Soil Bari Installatio�r <br /> Twelve exploratory soil borings will be drilled (refer to section <br /> 5.3) using hollow stem auger techniques. Each boring will <br /> FQ advanced to first ground water, with one boring continued to 40 <br /> below ground surface (BGS) to <br /> the subsurface geology the additional information on <br /> g gy at the site. The ground surface at this <br /> site, due to prior excavation, will be measured from the adjacent <br /> roadway surface and not from the excavated surface. All drill <br /> { ' cuttings will be containerized in 55 <br /> gallonheld <br /> the <br /> site until results of the soil samplechemi aln a alys st are <br /> obtained. The method of disposal for the cuttings will be <br /> r1 determined based on the results of the soil sample analytical <br /> results. After the samples are obtained each boring will be <br /> f=� sealed to within 1 foot below grade with a 51 bentonite-cement <br /> ij grout' The uppermost foot will be capped with concrete to <br /> provide structural support. <br /> 5.2 Monitor well Installation <br /> As the anticipated depth to water is approximately 20 feet BGS, <br /> !" the wells will be installed <br /> techniques. All drill using hollow stem auger drilling <br /> ;.� cuttings will be containerized in 55 <br /> gallon drums and held at the site until results of the soil <br /> sample chemical analyses are obtained. The method of disposal <br /> for the cuttings will be determined based on the results of the <br /> i <br /> soil sample analytical results. <br /> For soil sampling interval and for the determination if analysis <br /> is required, refer to section 5.3. <br /> The well casing and screen will be constructed from nominal 411 <br /> diameter flush threaded P.V.c. pipe, with a 15 foot screened <br /> interval placed lo feet into the uppermost <br /> extending 5 feet above the saturatedzone saasedaturat on zone and <br /> previous <br /> experiences in the area, a 0.010 inch slot screen size will be <br /> �+ used. rhis may require modification if the <br /> saturated formation is substantially differentfromain the s the <br /> -• slot size. screen <br /> The gravel pack for the wells will utilize a washed, <br /> kilned and bagged Monterey 2-15 silica sand <br /> placed <br /> well screen to a height of 2 feet above thetop of the <br /> well <br /> screen. The sandsin the event a <br /> ize may require modification <br /> different screen size is required. A one foot thick bentonite <br /> seal will be placed above the sand pack and the well annulus will <br /> then be sealed to the surface with a 5% bentonite cement grout. <br /> As the wells are in a construction area cx <br /> volume of equipment. traffic, all of the wells will be gr..ompleted <br /> z at the surface in a reinforced, pavement level vault, once <br /> installation is complete, the relative elevation of each well, as <br /> measured to the top of the 4 inch well casin <br /> by hand leveling. g, will be determined <br /> 9 - <br /> ia. <br />
The URL can be used to link to this page
Your browser does not support the video tag.