Laserfiche WebLink
i <br /> Mary Meays Page 2 <br /> San Joaquin County Environmental Health Division 22 June 1995 <br /> 20 February 1989 Problem Assessment Report, Underground Storage Tank <br /> Site Investigation <br /> 28 September 1989 Soil Remedial Excavation, Well Abandonment and Fuel Oil <br /> Tank Removal Project Report. <br /> 1 June 1992 Phase II Groundwater Investigation <br /> 14 May 1993 Quarterly Groundwater Monitoring Report, First Quarter <br /> 1993 <br /> 20 July 1993 Quarterly Groundwater Monitoring Report, Second Quarter <br /> 1993 <br /> 15 October 1993 Quarterly Groundwater Monitonng Report, Third Quarter <br /> 1993 <br /> 4 February 1994 Quarterly Groundwater Monitoring Report, Fourth Quarter <br /> 1993 <br /> All analytical results, well construction specifications, and quarterly groundwater elevations have <br /> been summarized from these reports and presented in the attached tables The titles of the tables <br /> are as follows <br /> Table Number Table Title <br /> 1 Analytical Results In Soil From 1988 Tank Removal <br /> 2 Analytical Results In Soil From 1988 Investigation <br /> 3 Analytical Results In Soil From 1989 Excavation <br /> 4 Analytical Results In Groundwater From December 1988 <br /> through April 1993 <br /> 5 Monitoring Well Specifications <br /> 6 Quarterly Groundwater Elevations <br /> Six figures were generated for this results summary and the are also attached Their titles are <br /> g g �'Y Y <br /> L 1,PR0JECPSSAN10Q\14SBLDG LTR <br />