Laserfiche WebLink
Alternative 9 <br /> Table 1 -Alternative 7 Cost Estimate <br />' ITEM Unit No of Units CostlUrnt($) Alternative Cost <br /> Mobilization <br /> site set up days 5 1500 7500 <br /> surveys days 0 1000 0 <br /> trader rental mo 0 500 0 <br /> permits Is 1 5000 5000 <br />' mobilize equipment days 0 1500 0 <br />' Treatment System <br /> pipe trench If 600 2515000 <br /> install wells each 13 5000 65000 <br /> install vaults each 14 1800 25200 <br /> modular treatment system each 1 100000 100000 <br /> electrical installation services 5 8000 40000 <br /> system testing days 3 1200 3600 <br />' utility rerouting each 15 4000 60000 <br /> Engineering <br /> design Is 1 25000 25000 <br />' Feld supervision days 30 600 18000 <br /> safety officer days 30 480 14400 <br /> SVEIAS pilot test each 1 35000 35000 <br /> O&M <br /> install 2 additional monitor wells Is 1 15000 15000 <br /> operating labor days 80 350 28000 <br />' carbon costs Ib 4000 1 5 6000 <br /> maintenance mo 18 500 9000 <br /> monitoring yr 2 24000 48000 <br /> electricity kwhr 9 80E+05 0 08 78400 <br /> Total Cost 598,000 <br /> 1 <br /> 1 <br /> r <br />' Page 1 <br />