Laserfiche WebLink
' f Alternative 3 <br /> Table 3-Alternative 3 Cost Estimate <br /> ITEM Unit No of Units Cost(Unit Alternative Cost <br /> Mobilization <br /> site set up days 1 1500 1500 <br /> surveys days 0 1000 0 <br /> trader rental mo 0 500 0 <br /> permits is 1 3000 3000 <br /> moblhze equipment days 0 1500 0 <br /> System installation <br /> install wells each 20 10000 200000 <br /> treatability testing lump sum 1 5000 5000 <br /> utility repairs each 5 2000 10000 <br /> Engineering <br /> design Is 1 5600 5000 <br /> field supervision days 5 600 3000 <br /> O&M <br /> install 2 monitor wells Is 1 15000 15000 <br /> monitoring yr 6 24000 144000 <br /> ORC costs per 8 months 8 11250 90000 <br /> Total Cost 477,000 <br /> 1 <br /> Page 1 <br />