My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010360
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0010360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:18:38 PM
Creation date
5/18/2020 2:55:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010360
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Y <br /> The fourth quarter ofPhase IV groundwater sampling was completed in May 1997 The CAP was submitted <br /> • to E1jD in January 1998 <br /> Quarterly groundwater sampling has been conducted since 1996 This report is the first quarter 2002 <br />' groundwater monitoring report which represents the thud report in the Phase IX groundwater sampling effort <br /> and presents the results of continued groundwater sampling following the schedule presented in Table 1-I <br />' Table 1-1 <br /> Sampling Schedule <br /> Quarter Monitor Wells to be Sampled <br /> First MW-2, MW-2A and MW-9 <br />' Second MW-2, MW-2A, MW-3A, MW-4, MW-6, MW-7 and MW-9 <br /> Third MW-2, MW-2A and MW-9 <br /> Fourth MW-2, MW-2A, MW-3A, MW-4, MW-5, MW-6, MW-7, and MW-9 <br /> 2.0 FIELD SAMPLING SUM]d"Y <br />' • Groundwater samples were collected from monitor wells MW-2,MW-2A, and MW-9(Figure 1-1)on April <br /> 17, 2002 In addition an equipment blank water sample was collected Groundwater sampling data sheets for <br /> the monitor wells are presented in Appendix B <br /> Water levels in all wells were measured on April 17, 2002 The standing water volumes within wells <br /> scheduled for sampling were calculated using water levels measured ineach well at the time of sampling and <br /> total well depths A submersible pump was used to purge three well casing volumes from each ofthe monitor <br /> wells <br /> At the beginning and during the purge process,the temperature,pH,and specific conductance ofthe purge <br /> water were measured This information was recorded on a sampling data sheet Groundwater samples for <br /> benzene,toluene,ethylbenzene,and xylene(BTEX)and for total petroleum hydrocarbons as gasoline(TPH- <br /> G)analysis were collected from the wells with a disposable bailer and nylon string The groundwater samples <br /> were transferred into 40 ml glass sample containers Sample containers were checked for air bubbles The <br /> sample containers were sealed in a plastic bag,placed with ice in an insulated chest,and logged on a chain-of- <br /> custody form for delivery to the analytical laboratory <br /> • <br /> I <br /> LWR0XCr513AN)OQW5A%1QOIRPT WPD 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.