My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1648
>
3500 - Local Oversight Program
>
PR0545689
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:04:14 PM
Creation date
5/18/2020 2:57:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545689
PE
3528
FACILITY_ID
FA0005164
FACILITY_NAME
FISCO WAREHOUSE
STREET_NUMBER
1648
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
00000
CURRENT_STATUS
02
SITE_LOCATION
1648 SHAW RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced GeoEnvironmental, Inc. <br /> Site Health and Safety Plan <br /> Page 3 of 7 <br /> Lods, flving hammer, snapped cables, etc. on the probin /dg rill rig_(if applicable). <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection have been <br /> designated for the applicable work areas or task: <br /> Location.. Job Function . Levels of Protection <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> Level D: hard hat <br /> steel-toed boots <br /> half-faced respirator (if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No changes of the specified levels of protection <br /> shall be made without the approval of the site safety officer and the project team leader. <br /> G.O. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> AGEā¢NC SHSPlver3.0/rem/3-96 Advanced GeoEnvironmeniai,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.