My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010365
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0010365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:22:27 PM
Creation date
5/18/2020 2:57:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010365
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1� Y <br /> uW.GERS DESCRf61CONSlAINRS <br /> . and the San Joaquin County Public Health Services Environmental Health Division (EHD) agreed <br /> that one year of quarterly groundwater monitoring would be performed (Table 1-1) It was also <br /> agreed that a corrective action plan (CAP) would be prepared following the completion of one <br /> year of quarterly groundwater monitoring (Roy F Weston, Work Plan for Phase IV Site <br /> Investigation and Quarterly Groundwater Sampling, February 1996) The Phase IV investigation <br /> and first round of groundwater sampling confirmed that soil contamination is present in the <br />' vicinity of MW-2A and that groundwater contamination is not present south (up gradient) of the <br /> former USTs The fourth quarter of Phase IV groundwater sampling was completed m May 1997 <br />' The CAP was submitted to EHD in January 1998 <br /> Quarterly groundwater sampling has been conducted since August 1996 This report is the fourth <br /> quarter 2000 groundwater monitoring report which represents the second report in the current <br /> fiscal year groundwater sampling effort and presents the results of continued groundwater <br />' sampling following the schedule presented 1n Table 1-1 <br /> Table 1-1 <br /> Sampling Schedule <br /> Quarter Monitor Wells to be Sampled <br /> First MW-2A and MW-9 <br /> Second MW-2A, MW-3A, MW-4, MW-6, MW-7, and MW-9 <br />' Third MW-2A and MW-9 <br /> Fourth MW-2A, MW-3A, MW-4, MW-5, MW-6, MW-7, and MW-9 <br />' 2.0 FIELD SAMPLING SUMMARY <br /> Groundwater samples were collected from monitor wells MW-2, MW-2A, MW-3A, MW-4, MW- <br /> 5, MW-6, MW-7, and MW-9 (Figure 1-1) on 1 and 2 November 2000 Groundwater sampling <br /> data sheets are presented in Appendix B <br />' Water levels in all wells were measured on 1 November The standing water volumes within <br /> wells scheduled for sampling were calculated using water levels measured in each well at the time <br /> of sampling and total well depths A submersible pump was used to purge three well casing <br /> volumes from each of the monitor wells <br /> NCASt-mdWRD1ECFSZAN10QWSA140WRPT WPD 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.