Laserfiche WebLink
I 1 . <br /> and the San Joaquin County Public Health Services Environmental Health Division (EHD) agreed <br /> that one year of quarterly groundwater monitoring would be performed (Table 1-1). It was also <br /> agreed that a corrective action plan (CAP) would be prepared following the completion of one <br />' year of quarterly groundwater monitoring (Roy F. Weston, Work Plan for Phase IV Site <br /> Investigation and Quarterly Groundwater Sampling, February 1996). The Phase IV investigation <br /> and first round of groundwater sampling confirmed that soil contamination is present in the <br />' vicinity of MW-2A and that groundwater contamination is not present south (up gradient) of the <br /> former USTs The fourth quarter of Phase IV groundwater sampling was completed in May 1997 <br />' The CAP was submitted to EHD in January 1998 <br />' This report is the fourth quarter 1999 groundwater monitoring report which represents the second <br /> report in the Phase VII groundwater sampling effort and presents the results of continued <br /> groundwater sampling following the schedule presented in Table 1-1. <br />' Table 1-1 <br /> Sampling Schedule <br /> Quarter Monitor Wells to be Sampled <br /> First MW-2A and MW-9 <br /> Second MW-2A, MW-3A, MW-4 MW-6, MW-7, and MW-9 <br /> Third MW-2A and MW-9 <br /> IFourth MW-2A, MW-3A, MW-4, MW-5, MW-6 MW-7, and MW-9 <br /> i <br /> 1 <br /> L\PROlEC MSAN70QU{SM4Q99R"WPD 2 <br />